Do you have any question about this error?
Message type: E = Error
Message class: WRF_PRC_OTB - Purchasing, Open-To-Buy, Seasonal Procurement Messages
Message number: 133
Message text: Item &1, schedule line &2: &3 &4 not usable contract budget exists
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
WRF_PRC_OTB133
- Item &1, schedule line &2: &3 &4 not usable contract budget exists ?The SAP error message WRF_PRC_OTB133 indicates that there is an issue with the availability of a contract budget for a specific item and schedule line in the context of procurement. This error typically arises when a purchase order or a scheduling agreement is being processed, and the system detects that the budget for the specified contract is not usable for the transaction being attempted.
Cause:
- Contract Budget Exists: The error suggests that there is a contract budget that exists for the item and schedule line, but it is not available for use. This could be due to several reasons:
- The budget has been fully utilized.
- The budget is blocked or not released for use.
- The item or schedule line does not meet the criteria set in the contract.
- The contract is not valid for the specific purchasing organization or plant.
Solution:
To resolve this error, you can take the following steps:
Check Contract Details:
- Verify the contract associated with the item and schedule line. Ensure that the contract is active and has sufficient budget available.
- Check if the contract is blocked or if there are any restrictions on its usage.
Review Budget Availability:
- Use transaction codes like ME33K (Display Contract) to check the details of the contract.
- Check the budget consumption and ensure that there is enough budget left for the item in question.
Validate Item and Schedule Line:
- Ensure that the item and schedule line are correctly defined in the contract.
- Confirm that the item category and other relevant settings are compatible with the contract.
Consult with Finance/Controlling:
- If the budget is managed by a different department, consult with the finance or controlling team to understand the budget status and any potential issues.
Adjust Purchase Order:
- If necessary, consider adjusting the purchase order or scheduling agreement to align with the available budget or to use a different contract that has an available budget.
System Configuration:
- If the issue persists, it may be necessary to check the system configuration or consult with your SAP Basis or technical team to ensure that there are no underlying system issues.
Related Information:
By following these steps, you should be able to identify the root cause of the error and take appropriate action to resolve it.
Get instant SAP help. Start your 7-day free trial now.
WRF_PRC_OTB132
Item &1, schedule line &2: &3 &4 will be used from non-contract budget
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WRF_PRC_OTB131
Item &1, schedule line &2: &3 &4 contract budget missing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WRF_PRC_OTB134
Budget &2 in document &1 was transferred successfully to &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WRF_PRC_OTB135
Start transfer posting for &1 before changing the node
What causes this issue? You want to change the node assignment for an article. As the article hierarchy is OTB-relevant, changes to the node assignme...
Click on this link to search all SAP messages.