Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_PPW700 - Mat. grp hierarchy node ignored; budget assignment at art. hier. level


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_PPW - Price Planning Workbench

  • Message number: 700

  • Message text: Mat. grp hierarchy node ignored; budget assignment at art. hier. level

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_PPW700 - Mat. grp hierarchy node ignored; budget assignment at art. hier. level ?

    Certainly! Here's a detailed explanation of the SAP error message:


    SAP Error Message:

    WRF_PPW700 Mat. grp hierarchy node ignored; budget assignment at art. hier. level


    Cause:

    This error occurs during budget processing or budget availability checks in SAP PS (Project System) or CO (Controlling) when the system encounters a material group hierarchy node that is ignored because the budget assignment is made at the article (material) hierarchy level instead of the material group hierarchy level.

    In other words, the budgeting or availability control is set up at a more detailed level (article/material hierarchy), but the system is trying to process or check budget at a higher-level node (material group hierarchy). Since the budget assignment is not defined at the material group hierarchy node, the system ignores that node during budget checks.


    Explanation:

    • Material Group Hierarchy: A classification structure grouping materials into hierarchies.
    • Article (Material) Hierarchy: A more detailed classification, often at the individual material or article level.
    • Budget Assignment: Budget can be assigned at different hierarchy levels. If assigned at a lower level (article), the system expects budget checks at that level.
    • When the system tries to check budget at a higher-level node (material group), but no budget is assigned there, it ignores that node and issues this warning/error.

    Solution:

    1. Check Budget Assignment Levels:

      • Verify at which hierarchy level the budget is assigned.
      • If budget is assigned at the article/material hierarchy level, ensure that budget checks are also performed at this level.
    2. Adjust Budget Assignment:

      • If necessary, assign budget at the material group hierarchy level to avoid ignoring nodes.
      • Alternatively, adjust the budget availability check settings to align with the hierarchy level where the budget is assigned.
    3. Review Configuration:

      • Check the configuration of budget availability control in transaction codes like OKKP (CO-OM: Maintain Controlling Area) or relevant PS budgeting settings.
      • Ensure that the hierarchy levels used in budgeting and availability control are consistent.
    4. Data Consistency:

      • Ensure that the material master data and hierarchy assignments are consistent and correctly maintained.
    5. Consult SAP Notes:

      • Look for SAP Notes related to budgeting and material group hierarchy issues for any patches or known fixes.

    Related Information:

    • Transactions:

      • CJ20N – Project Builder (for budget assignments)
      • OKKP – Maintain Controlling Area (budget availability control settings)
      • MM01/MM02 – Material Master (check material group assignments)
      • PPM – Product Portfolio Management (if applicable)
    • Modules Involved:

      • SAP PS (Project System)
      • SAP CO (Controlling)
      • SAP MM (Materials Management)
    • SAP Notes:

      • Search for notes related to "budget assignment material group hierarchy" or "WRF_PPW700" for specific corrections or recommendations.

    If you provide more context (e.g., transaction where error occurs, module, process), I can help tailor the solution further.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker