How To Fix WRF_PPW699 - Art.hierarchy node ignored; budget assignment at mat. grp hierarchy level


WRF_PPW699 - Overview

  • Message type: E = Error

  • Message class: WRF_PPW - Price Planning Workbench

  • Message number: 699

  • Message text: Art.hierarchy node ignored; budget assignment at mat. grp hierarchy level

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_PPW699 - Art.hierarchy node ignored; budget assignment at mat. grp hierarchy level ?
    Certainly! Here's a detailed explanation for the SAP error message:
    
    SAP Error Message:
    WRF_PPW699
    Text: Art.hierarchy node ignored; budget assignment at mat. grp hierarchy level
    
    
    Cause: This error occurs during budget processing or budget checking in SAP when the system encounters a budget assignment at the material group hierarchy level, but the system expects the budget assignment at the article (material) hierarchy node level. In other words, the budget is maintained or assigned at a higher or different level in the material hierarchy (e.g., material group level), but the system is trying to process or check the budget at the article (material) node level. Since the budget assignment is not found at the expected node, the system ignores the article hierarchy node for budget checking. Explanation: SAP uses material hierarchies for budget control in Purchasing or Materials Management. Budget assignments can be maintained at different hierarchy levels: e.g., material group, material, or article level. If the budget is assigned at

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant