Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_DISPRO005 - Activity canceled


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_DISPRO -

  • Message number: 005

  • Message text: Activity canceled

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_DISPRO005 - Activity canceled ?

    Certainly! Here's a detailed explanation regarding the SAP error message WRF_DISPRO005 - Activity canceled:


    SAP Error Message: WRF_DISPRO005 - Activity canceled

    1. Cause:

    The error message WRF_DISPRO005 - Activity canceled typically occurs in the Production Planning and Detailed Scheduling (PP-DS) or Advanced Planning and Optimization (APO) modules during the scheduling or production order processing. It indicates that a particular activity within the production order or process chain has been canceled or could not be executed as planned.

    Common causes include:

    • Manual cancellation of an activity or operation in the production order.
    • Scheduling conflicts or constraints that prevent the activity from being scheduled.
    • Resource unavailability or capacity overload leading to cancellation.
    • Incorrect or missing master data such as routing, work center, or resource data.
    • System inconsistencies or errors during the planning run.
    • Dependencies or predecessor activities not completed or canceled, causing subsequent activities to be canceled.
    • User intervention or system logic that cancels activities based on certain conditions.

    2. Solution:

    To resolve the WRF_DISPRO005 - Activity canceled error, follow these steps:

    • Check the Production Order or Planned Order:

      • Verify if the activity was manually canceled.
      • Review the status of the activity and the overall order.
    • Review Scheduling and Capacity:

      • Check resource availability and capacity loads.
      • Adjust capacity or reschedule conflicting activities.
    • Validate Master Data:

      • Ensure routing, work centers, and resources are correctly maintained.
      • Check for missing or incorrect data that could cause scheduling issues.
    • Analyze Dependencies:

      • Verify if predecessor activities are completed or canceled.
      • Adjust dependencies or sequence if necessary.
    • Check System Logs and Traces:

      • Use transaction codes like /SAPAPO/OM17 (for PP-DS) or SM37 (job monitoring) to analyze planning runs.
      • Look for related error messages or warnings.
    • Re-run Planning or Scheduling:

      • After corrections, re-execute the planning or scheduling run.
      • Monitor if the activity is now scheduled successfully.
    • Consult SAP Notes and Documentation:

      • Search for relevant SAP Notes that address this error.
      • Sometimes patches or support packages fix known issues.

    3. Related Information:

    • Module Context: This message is mostly seen in SAP APO PP-DS or SAP S/4HANA Production Planning environments.
    • Transaction Codes:
      • /SAPAPO/OM17 - PP-DS Detailed Scheduling Monitor
      • CO02 - Change Production Order
      • MF50 - Planning Table
      • SM37 - Job Monitoring
    • SAP Notes: Check SAP Support Portal for notes related to WRF_DISPRO005 or activity cancellation issues.
    • User Roles: Typically relevant for production planners, schedulers, and SAP PP consultants.
    • Impact: Activities canceled can delay production, affect delivery dates, and cause planning inconsistencies.

    If you provide more context (e.g., module, transaction, scenario), I can help tailor the solution further.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker