Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_BUDGET025 - No allocation found for budget &1, order period &2 to &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_BUDGET -

  • Message number: 025

  • Message text: No allocation found for budget &1, order period &2 to &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_BUDGET025 - No allocation found for budget &1, order period &2 to &3 ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Error Message:

    WRF_BUDGET025 No allocation found for budget &1, order period &2 to &3


    Meaning / Cause:

    This error occurs when the system tries to check or post a budget-related transaction, but it cannot find a valid budget allocation for the specified budget (budget ID &1) within the given order period (from &2 to &3). Essentially, the system is indicating that there is no budget available or allocated for the cost object or order during the specified time frame.

    Common causes include:

    • The budget has not been created or released for the specified period.
    • The budget allocation for the order or cost object is missing or incomplete.
    • The validity period of the budget does not cover the order period.
    • The budget profile or control settings do not allow budget checking for the given period.
    • The budget version or budget profile used in the transaction is incorrect or not maintained.

    Solution / How to Fix:

    1. Check Budget Master Data:

      • Verify that the budget (&1) exists and is active.
      • Check the validity period of the budget and ensure it covers the order period (&2 to &3).
    2. Check Budget Allocation:

      • Ensure that the budget has been allocated to the relevant cost object, internal order, or project for the specified period.
      • Use transaction codes like CJ30 (Maintain Budget) or CJ31 (Change Budget) to check and maintain budget allocations.
    3. Check Budget Versions:

      • Confirm that the correct budget version is being used in the transaction.
      • If multiple budget versions exist, ensure the one relevant for the posting is active and valid.
    4. Check Budget Profile and Control Settings:

      • Review the budget profile assigned to the order or cost object.
      • Ensure that budget checking is activated and configured correctly for the relevant periods.
    5. Adjust or Create Budget Allocation:

      • If no budget exists for the period, create or extend the budget allocation to cover the order period.
      • Release the budget if it is still in a preliminary or blocked status.
    6. Re-run the Transaction:

      • After correcting the budget allocation, retry the transaction that triggered the error.

    Related Information:

    • Transactions:

      • CJ30 - Maintain Budget
      • CJ31 - Change Budget
      • CJ32 - Display Budget
      • CJ20N - Project Builder (for project budgets)
      • KSB1 - Cost Centers: Actual Line Items (to check postings)
    • Tables:

      • CJBUD - Budget Master Data
      • CJBUDT - Budget for Internal Orders by Period
      • COSP / COSS - Cost Object Postings
    • Notes / SAP Help:

      • Check SAP OSS notes related to budget errors for your SAP version.
      • Refer to SAP Help Portal for Budgeting and Controlling (CO) module.

    Summary:

    The error WRF_BUDGET025 indicates missing or invalid budget allocation for the specified budget and period. To resolve it, verify and maintain the budget master data and allocations to ensure the budget covers the order period in question.


    If you provide the specific module or transaction where this error occurs, I can give more tailored advice.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant