How To Fix WRF_APC730 - Dateline has been recalculated for order list item &1 &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_APC - Messages for Operational Assortment Planning and Control

  • Message number: 730

  • Message text: Dateline has been recalculated for order list item &1 &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_APC730 - Dateline has been recalculated for order list item &1 &2 ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Message:

    WRF_APC730: Dateline has been recalculated for order list item &1 &2


    Cause:

    This message is typically issued by the Production Planning (PP) or Production Orders component in SAP when the system recalculates the dateline (due date or scheduling date) for a particular order list item.

    • The dateline (due date or scheduling date) for the order list item has been automatically adjusted or recalculated by the system.
    • This recalculation can happen due to changes in:
      • Material availability
      • Capacity constraints
      • Scheduling parameters
      • Lead times
      • Changes in order quantities or priorities
    • The recalculation ensures that the order schedule is feasible given the current system constraints and master data.

    Explanation:

    • The message is informational and not an error or warning.
    • It informs the user that the system has adjusted the planned dates to maintain consistency and feasibility.
    • The placeholders &1 and &2 represent:
      • &1: Order number or order list identifier
      • &2: Item number or operation number within the order list

    Solution / Action:

    • No immediate corrective action is required if the recalculated dateline is acceptable.
    • Review the recalculated dateline to ensure it aligns with production and delivery requirements.
    • If the recalculated dateline is not acceptable:
      • Check master data for lead times, scheduling parameters, and capacity.
      • Review material availability and procurement lead times.
      • Adjust order priorities or scheduling parameters if necessary.
      • Manually reschedule or adjust the order if needed.
    • Communicate with production planning or scheduling teams if the recalculation impacts delivery commitments.

    Related Information:

    • This message is part of the PP (Production Planning) or PP-SFC (Shop Floor Control) module.
    • It often appears during:
      • Order scheduling
      • Capacity leveling
      • Material availability checks
    • Transaction codes related to this process include:
      • CO02 (Change Production Order)
      • MF50 (Planning Table)
      • MF60 (Planning Table for repetitive manufacturing)
    • SAP Notes or documentation related to scheduling and dateline recalculations can provide further insights.

    Summary:

    Aspect Details
    Message WRF_APC730: Dateline has been recalculated for order list item &1 &2
    Cause System recalculated the due date/scheduling date due to changes in availability, capacity, or scheduling parameters
    Type Informational message
    Solution Review recalculated dates; adjust master data or scheduling if necessary
    Related Tcodes CO02, MF50, MF60

    If you want, I can help you with specific steps to analyze or adjust the scheduling parameters in your system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker