How To Fix WRF_APC244 - No ref. material found for material group &1; scheduling not possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_APC - Messages for Operational Assortment Planning and Control

  • Message number: 244

  • Message text: No ref. material found for material group &1; scheduling not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_APC244 - No ref. material found for material group &1; scheduling not possible ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Error Message:

    WRF_APC244 No ref. material found for material group &1; scheduling not possible


    Meaning / Cause:

    This error occurs during the production scheduling or planning process in SAP when the system tries to find a reference material for a given material group but fails to do so. The reference material is necessary for scheduling because it contains the master data or parameters required for planning.

    • Material Group: A classification of materials that share common characteristics.
    • Reference Material: A material within the group that has valid scheduling data (e.g., production versions, BOM, routing, or scheduling parameters).
    • The system expects at least one reference material in the material group to perform scheduling.
    • If no such reference material exists or is assigned, the system cannot proceed with scheduling and throws this error.

    Common Causes:

    1. No reference material assigned to the material group: The material group does not have any material flagged or designated as a reference material.
    2. Reference material missing master data: The reference material exists but lacks necessary master data like BOM, routing, or production versions.
    3. Incorrect or incomplete configuration: The material group or scheduling parameters are not properly maintained.
    4. Data inconsistency: The material group might be newly created or changed, but the reference material assignment was not updated.

    Solution / How to Fix:

    1. Assign a Reference Material to the Material Group:

      • Use transaction CM01 or relevant planning transactions to check the material group.
      • Assign a material within the group as the reference material.
      • This material should have complete and valid master data (BOM, routing, production versions).
    2. Check Master Data of Reference Material:

      • Verify that the reference material has all necessary data for scheduling:
        • BOM (Bill of Materials)
        • Routing or Recipe
        • Production versions
        • Scheduling parameters (lead times, lot sizes, etc.)
    3. Maintain Scheduling Parameters:

      • Ensure that scheduling parameters are maintained for the material group and reference material.
      • Use transaction CM02 or CM03 to check and maintain these parameters.
    4. Review Material Group Configuration:

      • Check if the material group is correctly defined and linked to the reference material.
      • Use transaction MMAM or relevant customizing transactions.
    5. Data Consistency Check:

      • Run consistency checks or reports to identify missing or incomplete data.
      • Correct any inconsistencies found.

    Additional Information:

    • This error is common in Production Planning (PP) and Advanced Planning and Optimization (APO) scenarios.
    • Reference materials serve as templates for scheduling other materials in the same group.
    • Proper master data maintenance is critical for smooth scheduling and planning.
    • If you are using SAP APO, ensure that the integration between SAP ERP and APO is correctly set up and master data is synchronized.

    Summary:

    Aspect Details
    Error Message WRF_APC244 No ref. material found for material group &1; scheduling not possible
    Cause No reference material assigned or found for the material group; scheduling data missing
    Solution Assign a valid reference material with complete master data to the material group
    Transactions CM01, CM02, CM03, MMAM (or relevant planning/configuration transactions)
    Related Areas Production Planning (PP), APO, Master Data Management

    If you need help with specific transaction steps or further troubleshooting, please let me know!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant