Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_APC096 - Hierarchy node &1 of hierarchy &2 is not an end node


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_APC - Messages for Operational Assortment Planning and Control

  • Message number: 096

  • Message text: Hierarchy node &1 of hierarchy &2 is not an end node

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_APC096 - Hierarchy node &1 of hierarchy &2 is not an end node ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Error Message:

    WRF_APC096: Hierarchy node &1 of hierarchy &2 is not an end node


    Meaning / Cause:

    This error occurs in SAP when a hierarchy node that is expected to be an end node (leaf node) in a hierarchy structure is actually not an end node. In other words, the system expects the node to have no child nodes (i.e., it should be a terminal node in the hierarchy), but the node you are trying to use or reference has one or more child nodes.

    This situation typically arises in the context of APC (Activity Price Calculation) or costing hierarchies, where certain operations or calculations require the selection of leaf nodes only.


    When does it occur?

    • When you try to assign or use a hierarchy node in costing or activity price calculation that must be a leaf node but is not.
    • When defining or processing hierarchies in SAP Controlling (CO) or Product Costing (CO-PC).
    • During the execution of costing runs, activity price calculations, or when working with cost component splits or cost center hierarchies.

    Explanation:

    • Hierarchy &2: This is the name or ID of the hierarchy.
    • Hierarchy node &1: This is the node within the hierarchy that is being referenced.
    • The system expects node &1 to be an end node (leaf node) but it has child nodes, so it cannot be used in the current context.

    Solution / How to fix:

    1. Check the hierarchy structure:

      • Go to the hierarchy &2 in the relevant SAP transaction (e.g., transaction KCH1 for cost center hierarchies or the relevant APC hierarchy maintenance transaction).
      • Verify the node &1 and check if it has child nodes.
    2. Use a leaf node:

      • Instead of using node &1, select a node that is an end node (a node without any children).
      • If you need to use node &1, ensure that it is converted into a leaf node by removing or reassigning its child nodes.
    3. Adjust the hierarchy if necessary:

      • If the business process requires node &1 to be used as an end node, restructure the hierarchy so that node &1 has no children.
      • This might involve moving child nodes to other parts of the hierarchy or deleting unnecessary nodes.
    4. Check configuration and master data:

      • Ensure that the hierarchy is correctly maintained and consistent.
      • Validate that the hierarchy nodes are correctly assigned in master data and costing runs.
    5. Consult documentation or SAP notes:

      • Sometimes, specific SAP Notes address issues related to hierarchy handling in APC or costing.
      • Search SAP Support Portal for notes related to WRF_APC096 or hierarchy node errors.

    Related Information:

    • Hierarchy nodes in SAP are structured in a tree format, where end nodes (leaf nodes) are nodes without children.
    • Many costing and controlling processes require leaf nodes because calculations or assignments are done at the most granular level.
    • Transactions to maintain hierarchies include:
      • KCH1 / KCH2 / KCH3 for cost center hierarchies.
      • CKH1 / CKH2 / CKH3 for product cost hierarchies.
    • APC (Activity Price Calculation) uses hierarchies to roll up or distribute costs; incorrect node selection can cause errors.
    • Always ensure hierarchy consistency and correctness before running costing or APC processes.

    If you provide the exact transaction or process where this error occurs, I can give more tailored advice.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant