Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix W/151 - Phase &1 mat. &2 does not exist in DChain &3 &4 - processing not possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: W/ -

  • Message number: 151

  • Message text: Phase &1 mat. &2 does not exist in DChain &3 &4 - processing not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message W/151 - Phase &1 mat. &2 does not exist in DChain &3 &4 - processing not possible ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Error Message:

    W/151 Phase &1 mat. &2 does not exist in DChain &3 &4 - processing not possible


    Meaning / Cause:

    This warning message indicates that a particular phase (&1) for a material (&2) does not exist in the distribution chain (DChain) (&3 &4). In other words, the system is trying to process or reference a phase of a material within a distribution chain, but that phase is not defined or maintained in the distribution chain data.

    • Phase (&1): The specific phase or step in the distribution chain process.
    • Material (&2): The material number or identifier.
    • DChain (&3 &4): The distribution chain identifier and possibly additional details (like plant or location).

    This typically occurs during processes involving distribution chains, such as in sales and distribution (SD) or logistics execution (LE), where phases represent steps in the distribution or delivery process.


    Common Causes:

    1. Missing Phase in Distribution Chain: The phase for the material has not been maintained or created in the distribution chain.
    2. Incorrect Distribution Chain Configuration: The distribution chain might be incomplete or incorrectly set up.
    3. Data Inconsistency: The material master or distribution chain data might be inconsistent or outdated.
    4. Customizing or Master Data Error: The phase might be valid but not assigned properly in customizing or master data.

    Solution / How to Fix:

    1. Check Distribution Chain Configuration:

      • Go to the customizing transaction for distribution chains (e.g., SPRO ? Logistics Execution ? Shipping ? Basic Shipping Functions ? Define Distribution Chains).
      • Verify that the distribution chain (&3 &4) exists and is correctly configured.
    2. Maintain Phases for the Material:

      • Ensure that the phase (&1) is maintained for the material (&2) in the distribution chain.
      • Use transaction codes like VL01N / VL02N or relevant logistics transactions to check phases.
      • Alternatively, check the distribution chain phases in customizing or master data.
    3. Update or Correct Master Data:

      • Verify the material master data (MM03) and ensure it is correctly linked to the distribution chain.
      • Check if the material is assigned to the correct distribution chain and phases.
    4. Recreate or Adjust Distribution Chain:

      • If the distribution chain is incomplete, add the missing phases.
      • If necessary, recreate or adjust the distribution chain to include all required phases for the materials involved.
    5. Consult SAP Notes / Documentation:

      • Check SAP Notes for any known issues related to distribution chains and phases.
      • Review SAP Help Portal for detailed configuration steps.

    Additional Information:

    • Distribution Chain: Represents the path or process through which goods are distributed from the plant to the customer.
    • Phases: Represent steps or stages in the distribution process, such as picking, packing, shipping, etc.
    • This message is a warning (W), so processing might be halted or limited until the issue is resolved.
    • The error often appears during delivery creation, shipment processing, or related logistics transactions.

    Summary:

    Aspect Details
    Error Type Warning (W/151)
    Cause Phase for material missing in distribution chain
    Impact Processing not possible for the material in the distribution chain
    Solution Maintain missing phase in distribution chain configuration or master data
    Transactions SPRO (customizing), VL01N/VL02N (delivery), MM03 (material master)

    If you provide the exact transaction or scenario where this error occurs, I can help with more specific steps.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker