Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix W/076 - Individual phases have been activated. Entries rejected


SAP Error Message - Details

  • Message type: E = Error

  • Message class: W/ -

  • Message number: 076

  • Message text: Individual phases have been activated. Entries rejected

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message W/076 - Individual phases have been activated. Entries rejected ?

    SAP Error Message:
    W/076 Individual phases have been activated. Entries rejected


    Cause:

    This warning message typically occurs in SAP Project System (PS) or related modules when you try to post or process data for a project or network activity, but the system detects that individual phases (or sub-phases) of the project have already been activated or processed. Because these phases are individually activated, the system rejects entries that conflict with this status to maintain data consistency.

    In other words, the system prevents changes or postings that would contradict the current activation status of individual phases within a project or network.


    When does it occur?

    • When attempting to post costs, confirmations, or progress updates to a project/network where individual phases have been activated.
    • When trying to perform mass updates or postings that do not consider the activation status of individual phases.
    • During settlement or progress confirmation steps in Project System or Plant Maintenance (PM) where phase activation controls are in place.

    Solution:

    1. Check Phase Activation Status:

      • Review the project/network structure and verify which phases are activated.
      • Use transaction codes like CJ20N (Project Builder) or CN41 (Network Overview) to inspect phase statuses.
    2. Adjust Posting or Processing Logic:

      • Ensure that postings or confirmations are made at the correct phase level.
      • Avoid posting to the overall project or network if individual phases are activated and require separate handling.
    3. Deactivate or Reset Phase Activation (if appropriate):

      • If the activation was done in error, phases can sometimes be deactivated or reset, depending on business rules and system configuration.
      • This usually requires authorization and careful consideration, as it may affect project progress tracking.
    4. Consult Configuration Settings:

      • Check if the system is configured to allow postings on individual phases or only on the overall project/network.
      • Adjust settings in Project System or Plant Maintenance customizing if necessary.
    5. Coordinate with Project Management:

      • Confirm with project managers or controlling teams about the intended process for phase activation and postings.
      • Align system usage with business processes.

    Related Information:

    • Transaction Codes:

      • CJ20N – Project Builder (to view and edit project phases)
      • CN41 – Network Overview
      • CN43N – Display Network
      • CJ88 – Settlement of Projects
      • IW41 – PM Confirmation (if related to maintenance orders)
    • SAP Notes and Documentation:

      • Check SAP Notes related to project phase activation and postings.
      • Review SAP Help Portal documentation on Project System phase management.
    • Business Process Impact:

      • Phase activation is used to control and monitor project progress at a granular level.
      • Ensures that postings and confirmations are consistent with project status.

    Summary:

    The message W/076 Individual phases have been activated. Entries rejected indicates that the system is preventing postings or entries because individual project phases are already activated. To resolve this, verify the activation status of phases, adjust postings to the correct level, or coordinate with project management to align system usage with business processes.


    If you provide more context (e.g., module, transaction, exact action causing the message), I can offer more tailored advice.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker