Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VQ - SD Archiving and Product Allocation
Message number: 301
Message text: End of allocation validity should always be end of a period (&1, &2).
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
VQ301
- End of allocation validity should always be end of a period (&1, &2). ?The SAP error message:
VQ301 End of allocation validity should always be end of a period (&1, &2).
Cause:
This error occurs when you try to enter or maintain an allocation validity period in SAP where the end date of the allocation validity is not the last day of a period (e.g., not the last day of a month, quarter, or fiscal period). SAP requires that the end date of allocation validity must always correspond to the end of a defined period to ensure consistency in allocation cycles and period-end processing.
For example, if your allocation validity period is from 01.01.2024 to 15.01.2024, this will trigger the error because 15.01.2024 is not the end of a period (e.g., end of month or quarter). The end date should be 31.01.2024 (end of month) or the relevant period end date.
Solution:
Aspect | Details |
---|---|
Error Message | VQ301 End of allocation validity should always be end of a period (&1, &2). |
Cause | End date of allocation validity is not the last day of a valid period (month/quarter). |
Solution | Change the end date to the last day of the relevant period (e.g., 31.01.2024). |
Related Info | Check fiscal year variant, posting periods, and allocation cycle definitions. |
If you need help identifying the correct period end dates or adjusting the allocation validity, please provide the transaction or process you are working on, and I can guide you further.
Get instant SAP help. Sign up for our Free Essentials Plan.
VQ300
No active times have been defined for procedure &1, step &2.
What causes this issue? In product allocation controlling, no periods describing when product allocation is active are defined for product allocation...
VQ299
There are no tax entries for product allocation procedure &1, &2!
What causes this issue? No entries exist in product allocation controlling (maintain view V_T190) for the product allocation procedure.System Respons...
VQ302
The product allocation objects are entered in the planning hierarchy.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VQ303
Object &1 not contained in the planning hierarchy!
What causes this issue? Object &v1& is not in the planning hierarchy of the info structure &v2&.System Response No product allocatio...
Click on this link to search all SAP messages.