How To Fix VPK1005 - Item &1 cannot be processed( use Project Services apps. )


SAP Error Message - Details

  • Message type: E = Error

  • Message class: VPK1 - SPC Processor Messages

  • Message number: 005

  • Message text: Item &1 cannot be processed( use Project Services apps. )

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VPK1005 - Item &1 cannot be processed( use Project Services apps. ) ?

    The SAP error message:

    VPK1005: Item &1 cannot be processed (use Project Services apps.)


    Cause:

    This error occurs when you try to process or post an item in a logistics or sales document that is linked to a project system (PS) element, but the system expects you to handle this item through the Project System (PS) or Project Services applications instead of the standard logistics or sales processing transactions.

    In other words, the item is assigned to a project-related account assignment or has project-specific characteristics that require processing via Project System tools/apps, not through the usual sales or logistics transaction.


    Explanation:

    • The item is linked to a project (e.g., WBS element, network, or project-related order).
    • The standard processing transaction does not support direct processing of project-related items.
    • SAP enforces the use of Project System (PS) or Project Services applications to ensure proper handling of project-related postings, budgeting, and controlling.

    Solution:

    1. Use Project Services Apps:

      • Instead of processing the item in the standard sales or logistics transaction, use the appropriate Project System or Project Services application.
      • For example, use apps or transactions like:
        • CJ20N (Project Builder)
        • CJ88 (Settlement of WBS elements)
        • CJI3 (Project Actual Cost Line Items)
        • Project Services Fiori apps if you are on SAP S/4HANA
    2. Check Account Assignment:

      • Verify the account assignment category of the item.
      • If it is assigned to a project element (WBS, network), ensure that the processing is done via PS.
    3. Adjust Process Flow:

      • If the business process requires processing the item in logistics or sales, reconsider the account assignment or project integration.
      • Possibly remove the project assignment if it is not required.
    4. Consult Project System Team:

      • Coordinate with the PS or controlling team to understand the correct process for handling project-related items.

    Related Information:

    • This message is common in scenarios where logistics or sales documents are integrated with Project System.
    • It ensures data consistency and proper project cost tracking.
    • The message is part of SAP's validation to prevent incorrect postings that could affect project accounting.
    • Refer to SAP Note or documentation related to integration between SD/MM and PS modules.
    • In SAP S/4HANA, Project Services apps provide enhanced capabilities for project-related processing.

    Summary:

    Aspect Details
    Cause Item linked to project system element; standard processing not allowed for such items.
    Solution Process the item using Project Services apps or PS transactions (CJ20N, CJ88, etc.).
    Additional Check account assignment; coordinate with PS team; ensure correct process flow.

    If you need further help, please provide the transaction code and context where the error occurs.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker