Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VMP_MSG - VMP Message Manager
Message number: 380
Message text: Source and target hierarchy for the component &1 do not match.
The component in the target panel is part of an assembly that does not
match the hierarchical structure in the source panel.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The system displays an error message when it finds inconsistency between
the source and target hierarchical structures.
You must correct the structure by rearranging the hierarchical structure
in the target.
Error message extract from SAP system. Copyright SAP SE.
VMP_MSG380
- Source and target hierarchy for the component &1 do not match. ?Certainly! Here's a detailed explanation for the SAP error message:
SAP Error Message:
VMP_MSG380: Source and target hierarchy for the component &1 do not match.
Cause:
This error occurs during the processing of a production order, process order, or during the component assignment in the production or planning process. The system checks the hierarchy of components in the Bill of Materials (BOM) or routing and finds that the source hierarchy (where the component is currently assigned) and the target hierarchy (where the component is being assigned or moved) do not match.
In other words, the component is expected to be assigned to a certain hierarchy level (e.g., assembly, sub-assembly) but the system detects a mismatch between the source and target hierarchy levels for that component.
This can happen due to:
To resolve this error, you should:
Check the BOM Structure:
CS03
(Display BOM) to check the component hierarchy.Check the Routing or Recipe:
CA03
(Display Routing) or C203
(Display Process Order) to check component assignments.Check Component Assignment in the Order:
CO02
(Change Production Order) or COR2
(Change Process Order) to verify and correct component assignments.Adjust the Hierarchy:
Recreate or Update BOM/Routing:
Check for Notes or SAP Support:
Transactions:
CS03
- Display BOMCS02
- Change BOMCA03
- Display RoutingCA02
- Change RoutingCO02
- Change Production OrderCOR2
- Change Process OrderSAP Modules:
SAP Notes:
VMP_MSG380
or component hierarchy mismatch for your SAP version.If you provide more context (e.g., during which transaction or process the error occurs), I can help with more specific guidance.
Get instant SAP help. Sign up for our Free Essentials Plan.
VMP_MSG379
Can't perform action as reference designator already maintained in source
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG378
Planning scope contains 3D and PMI changes, save planning before you exit
What causes this issue? The planning scope contains viewables that are either of type 3D or product manufacturing information (PMI) or both.System Re...
VMP_MSG381
BOM item &1 should be within the assembly of &2.
What causes this issue? When an assembly from the source is moved to target, you must also plan all the components with the assembly. You can create ...
VMP_MSG382
Error occurred due to arithmetic overflow exception.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.