How To Fix VMP_MSG355 - Deleted target BOM(s) has been removed from planning scope


SAP Error Message - Details

  • Message type: E = Error

  • Message class: VMP_MSG - VMP Message Manager

  • Message number: 355

  • Message text: Deleted target BOM(s) has been removed from planning scope

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VMP_MSG355 - Deleted target BOM(s) has been removed from planning scope ?

    Certainly! Here's a detailed explanation regarding the SAP error message:


    SAP Error Message:

    VMP_MSG355: Deleted target BOM(s) has been removed from planning scope


    Cause:

    This message occurs during the Product Cost Planning or Material Requirements Planning (MRP) run when the system detects that a target BOM (Bill of Materials), which was previously used or planned, has been deleted or removed from the planning scope.

    • The target BOM is the BOM version that is currently active or planned for production.
    • If this BOM is deleted or no longer valid (e.g., marked as deleted or removed from the planning scope), the system cannot use it for planning or costing.
    • This situation often arises when BOMs are changed, deleted, or when the planning scope is adjusted (e.g., filtering out certain BOMs or materials).

    Explanation:

    • The system informs you that the BOM(s) that were previously considered in planning have been deleted or excluded.
    • This is a warning or informational message indicating that the planning run will not consider these BOMs anymore.
    • It helps avoid inconsistencies in planning or costing results due to missing BOM data.

    Solution / How to Resolve:

    1. Check BOM Status:

      • Verify if the BOM(s) mentioned in the message have indeed been deleted or marked as deleted.
      • Use transaction CS03 (Display BOM) to check the BOM status.
      • If the BOM is deleted but still required, consider restoring or recreating it.
    2. Review Planning Scope:

      • Check the planning scope settings in your MRP or costing run.
      • Ensure that the BOMs you want to plan are included in the scope.
      • Adjust filters or selection criteria if necessary.
    3. Update BOMs:

      • If BOMs have been replaced or changed, update the material master or routing accordingly.
      • Make sure the correct BOM version is assigned and active.
    4. Re-run Planning:

      • After correcting BOM status or planning scope, re-run the planning or costing process.
      • The message should no longer appear if BOMs are valid and included.
    5. Check for Customizing or User Exits:

      • Sometimes, custom logic or user exits might exclude BOMs from planning.
      • Review any custom code or settings that might affect BOM selection.

    Related Information:

    • Transactions:

      • CS03 - Display BOM
      • CS02 - Change BOM
      • CK11N - Create Cost Estimate
      • MD01 / MD02 - MRP Run
      • CK40N - Costing Run
    • Tables:

      • STPO - BOM item
      • STPOZ - BOM item change documents
      • STPOX - BOM item deletion flag
    • Notes / Documentation:

      • SAP Notes related to BOM deletion and planning scope.
      • Check SAP Help Portal for BOM and MRP integration.

    Summary:

    The message VMP_MSG355 is an informational warning indicating that some BOMs previously planned have been deleted or removed from the planning scope. To resolve, verify BOM status, adjust planning scope, and ensure BOMs are valid and active before re-running planning or costing.


    If you need help with a specific scenario or further troubleshooting, please provide additional details such as the transaction used, material number, or planning run context.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author