How To Fix VMP_MSG236 - Explosion Date &1 copied from simulation


VMP_MSG236 - Overview

  • Message type: E = Error

  • Message class: VMP_MSG - VMP Message Manager

  • Message number: 236

  • Message text: Explosion Date &1 copied from simulation

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VMP_MSG236 - Explosion Date &1 copied from simulation ?
    The SAP error message VMP_MSG236 typically relates to issues with the explosion date in the context of a simulation run in the SAP system, particularly in the area of production planning or material requirements planning (MRP). This error indicates that there is a problem with the explosion date being copied from a simulation, which can affect the planning and scheduling of production orders.
    
    Cause: The error can occur due to several reasons, including: Invalid Explosion Date: The explosion date being copied may not be valid or may not fall within the acceptable range for the planning process.
    Configuration Issues: There may be configuration settings in the MRP or production planning module that are not set correctly, leading to issues with date handling. Data Integrity Issues: There could be inconsistencies or missing data in the master data (like BOMs, routing, etc.) that affect the explosion process. Simulation Settings: The settings used during the simulation may not align

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker