Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VMP_MSG - VMP Message Manager
Message number: 151
Message text: PSM explosion date &1 is not between simulation dates &2 and &3
You created an MBOM having assemblies with no components in the Planned
Panel.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Reload the planning scope alternative and allocate components to the
assemblies.
Error message extract from SAP system. Copyright SAP SE.
VMP_MSG151
- PSM explosion date &1 is not between simulation dates &2 and &3 ?The SAP error message VMP_MSG151 indicates that there is a problem with the simulation dates in relation to the explosion date of a Product Structure Management (PSM) process. Specifically, the error states that the explosion date you are trying to use is not within the range of the specified simulation dates.
Cause:
This error typically occurs when:
- The explosion date (the date when the product structure is to be exploded) is set outside the range of the simulation dates that have been defined in the system.
- There may be a mismatch in the configuration of the simulation parameters, leading to an invalid date range.
- The system may be configured to only allow certain date ranges for simulations, and the explosion date does not comply with these constraints.
Solution:
To resolve this error, you can take the following steps:
Check the Explosion Date: Verify the explosion date you are trying to use. Ensure that it is set correctly and is intended for the simulation you are running.
Review Simulation Dates: Look at the simulation dates that have been defined in the system. You can do this by navigating to the relevant transaction or configuration settings in SAP. Ensure that the explosion date falls within this range.
Adjust Dates: If the explosion date is indeed outside the simulation date range, you will need to either:
- Change the explosion date to a valid date that falls within the simulation date range.
- Adjust the simulation date range to include the explosion date if that is appropriate for your business process.
Configuration Settings: If you are unsure about how to adjust the simulation dates or explosion date, consult with your SAP administrator or a functional consultant who can help you with the configuration settings.
Testing: After making the necessary adjustments, re-run the simulation to ensure that the error is resolved.
Related Information:
CS01
, CS02
, or CS03
for creating, changing, or displaying BOMs (Bill of Materials) which may be related to the explosion date.If the issue persists after following these steps, consider reaching out to SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
VMP_MSG150
PSM explosion date &1 does not match simulation date &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG149
PSM material &1 does not match simulation material &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG152
PSM usage &1 does not match simulation usage &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG153
PSM plant &1 does not match simulation plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.