How To Fix VMP_MSG150 - PSM explosion date &1 does not match simulation date &2


VMP_MSG150 - Overview

  • Message type: E = Error

  • Message class: VMP_MSG - VMP Message Manager

  • Message number: 150

  • Message text: PSM explosion date &1 does not match simulation date &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VMP_MSG150 - PSM explosion date &1 does not match simulation date &2 ?
    The SAP error message VMP_MSG150 indicates a mismatch between the planned simulation date and the explosion date in the context of Product Structure Management (PSM) or similar modules. This error typically arises during the process of simulating a production order or when working with bill of materials (BOM) and routing data.
    
    Cause: The error occurs when the explosion date (the date when the BOM is to be exploded for planning purposes) does not match the simulation date (the date for which the simulation is being run). This can happen due to several reasons: Incorrect Date Settings: The simulation date may have been set incorrectly, or the explosion date in the BOM or routing may not align with the expected simulation date. Master Data Issues: There may be inconsistencies in the master data, such as the validity periods of the BOM or routing not aligning with the simulation date. Configuration Errors: There could be configuration issues

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant