Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VL -
Message number: 291
Message text: Goods issue date &1 at &2 set; &3 at &4 was planned in the schedule line
Goods issue date was changed to &V1& at &V2&. In the order item
schedule line, goods issue was planned for &V3& at &V4&.
The system rescheduled the shipping deadlines.
Error message extract from SAP system. Copyright SAP SE.
VL291
- Goods issue date &1 at &2 set; &3 at &4 was planned in the schedule line ?The SAP error message VL291 indicates that there is a discrepancy between the goods issue date and the planned delivery dates in the schedule line of a sales order or delivery. This error typically arises when the system detects that the goods issue date does not align with the expected delivery dates for the items in the schedule line.
Cause:
- Mismatch in Dates: The goods issue date specified in the delivery document does not match the planned delivery date in the schedule line.
- Incorrect Configuration: There may be issues with the configuration of the delivery dates in the material master or sales order.
- Changes in Delivery Dates: If the delivery dates were changed after the schedule line was created, it could lead to this error.
- Planning Parameters: The planning parameters for the material or the sales order may not be set correctly, leading to inconsistencies.
Solution:
- Check Dates: Review the goods issue date and the planned delivery dates in the schedule line. Ensure that they are consistent and correct.
- Adjust Schedule Line: If necessary, adjust the schedule line to match the goods issue date. This can be done in the sales order or delivery document.
- Review Configuration: Check the configuration settings for the material and sales order to ensure that they are set up correctly for delivery dates.
- Recreate Delivery: If the issue persists, consider recreating the delivery document after ensuring that all dates are aligned correctly.
- Consult Documentation: Refer to SAP documentation or consult with your SAP support team for specific configuration settings that may need to be adjusted.
Related Information:
By following these steps, you should be able to resolve the VL291 error and ensure that the goods issue date aligns with the planned delivery dates in the schedule line.
Get instant SAP help. Sign up for our Free Essentials Plan.
VL290
Shipping type in delivery &1 does not match shipping type &2 in route &3
What causes this issue? The shipping type &V1&, which is assigned to the delivery, does not agree with shipping type &V2&, which is i...
VL289
Volume of the delivery exceeds the capacity of the means of transport
What causes this issue? The total volume of the delivery exceeds the capacity of the means of transport (&V1&) assigned to the delivery.Syste...
VL292
The item number in reference item &2 is greater than 899999
What causes this issue? In reference document &V1& item &V2& has an item number that is bigger than 899999. This item should be copie...
VL293
Conversion for &1/&2 does not exist
What causes this issue? Conversion between the &V1& (packing quantity) and &V2& (delivery item) units of measure does not exist.Syste...