Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix VELO384 - Date determination not possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: VELO - Vehicle Management System

  • Message number: 384

  • Message text: Date determination not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VELO384 - Date determination not possible ?

    The SAP error message VELO384, which states "Date determination not possible," typically occurs in the context of logistics and supply chain processes, particularly when dealing with delivery dates, production dates, or scheduling in SAP systems. This error can arise due to various reasons related to date settings, configuration, or master data.

    Causes of VELO384

    1. Missing or Incorrect Configuration: The date determination settings in the system may not be properly configured. This can include settings related to the planning calendar, lead times, or other date-related parameters.

    2. Master Data Issues: The master data for materials, vendors, or customers may be incomplete or incorrect. For example, if a material does not have a valid production lead time or if a vendor's delivery schedule is not set up correctly, it can lead to this error.

    3. Date Overlap or Conflicts: If there are conflicting dates in the system, such as a delivery date that falls outside of the allowed range or overlaps with other scheduled activities, the system may not be able to determine a valid date.

    4. System Settings: The system may not have the necessary settings enabled for date determination, such as the correct planning strategy or scheduling parameters.

    Solutions to VELO384

    1. Check Configuration Settings:

      • Review the configuration settings for date determination in the relevant modules (e.g., Sales and Distribution, Materials Management, Production Planning).
      • Ensure that the planning calendar, lead times, and other related parameters are correctly set up.
    2. Review Master Data:

      • Check the master data for the materials, vendors, and customers involved in the transaction. Ensure that all necessary fields are filled out correctly, including lead times and delivery schedules.
      • Update any missing or incorrect data.
    3. Analyze Date Overlaps:

      • Investigate any potential conflicts in the dates being used. Ensure that the delivery dates, production dates, and other relevant dates do not overlap or fall outside of acceptable ranges.
    4. Consult SAP Notes:

      • Search for relevant SAP Notes or Knowledge Base Articles (KBAs) that may address this specific error. SAP frequently updates its documentation and may provide specific fixes or patches.
    5. Testing and Validation:

      • After making changes, perform tests to validate that the date determination process works as expected. Create test scenarios to ensure that the error does not reoccur.
    6. Seek Help from SAP Support:

      • If the issue persists after checking the above areas, consider reaching out to SAP Support for further assistance. Provide them with detailed information about the error, including transaction codes, configuration settings, and any relevant logs.

    Related Information

    • Transaction Codes: Familiarize yourself with transaction codes related to date determination, such as MD01 (MRP Run), CO01 (Create Production Order), or VL01N (Create Outbound Delivery).
    • Documentation: Review SAP documentation related to logistics and date determination processes for a deeper understanding of how dates are calculated and managed within the system.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify the root cause of the VELO384 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author