Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix V1638 - Scheduling is only possible for assembly items with network


SAP Error Message - Details

  • Message type: E = Error

  • Message class: V1 - Verkaufsbelegbearbeitung

  • Message number: 638

  • Message text: Scheduling is only possible for assembly items with network

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message V1638 - Scheduling is only possible for assembly items with network ?

    The SAP error message V1638, which states "Scheduling is only possible for assembly items with network," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system is unable to schedule the production of an assembly item because it lacks the necessary network structure.

    Cause:

    1. Missing Network Assignment: The assembly item you are trying to schedule does not have a production network (or routing) assigned to it. In SAP, a network is essential for scheduling as it defines the sequence of operations and the resources required for production.
    2. Incorrect Item Type: The item may not be defined as an assembly item in the material master, or it may be set up incorrectly in the Bill of Materials (BOM).
    3. Incomplete Master Data: The master data for the assembly item may be incomplete or incorrectly configured, leading to the inability to create a scheduling network.

    Solution:

    1. Check Material Master: Ensure that the material master for the assembly item is correctly set up. Verify that it is defined as an assembly item and that all relevant fields are filled out correctly.
    2. Assign a Production Network: If the assembly item does not have a network assigned, you will need to create or assign a production network. This can be done in the following way:
      • Go to the transaction code CNO1 (Create Network) or CNO2 (Change Network) to create or modify the network for the assembly item.
      • Ensure that the network includes all necessary operations and resources.
    3. Check Routing: Ensure that the routing for the assembly item is correctly defined. You can check this using transaction code CA03 (Display Routing) to see if the routing exists and is correctly linked to the assembly item.
    4. Review BOM: Check the Bill of Materials (BOM) for the assembly item to ensure that it is correctly defined and that all components are available.
    5. Consult Documentation: If you are unsure about the setup, refer to SAP documentation or consult with your SAP support team for guidance on how to properly configure assembly items and networks.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • CNO1 / CNO2: For creating and changing networks.
      • CA03: For displaying routings.
      • CS03: For displaying BOMs.
    • SAP Notes: Check SAP Notes for any known issues or additional guidance related to this error message.
    • Training and Documentation: Consider reviewing SAP training materials or documentation related to production planning and scheduling to better understand the concepts of networks, routings, and assembly items.

    By following these steps, you should be able to resolve the V1638 error and successfully schedule the assembly item in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author