How To Fix V1138 - Planning allocation cannot be carried out for material &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: V1 - Verkaufsbelegbearbeitung

  • Message number: 138

  • Message text: Planning allocation cannot be carried out for material &

  • Show details Hide details
  • What causes this issue?

    Planning material &V2& (plant &V3&) for material &V1& entered in item
    &V4& is momentarily blocked by another transaction.

    System Response

    The system cannot carry out the transfer of requirements nor check if
    the assignment for planning is possible. It therefore skips these
    processing steps.

    How to fix this error?

    After you have verified that material &V2& (plant &V3&) is unblocked
    you must initiate the assignment check and the transfer of requirements
    manually to complete the processing correctly. You do this by calling
    up the function 'Item availability' in the 'Edit' menus on the overview
    or item screen.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message V1138 - Planning allocation cannot be carried out for material & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker