Message type: E = Error
Message class: V1 - Verkaufsbelegbearbeitung
Message number: 110
Message text: BOM explosion of item & had to be terminated
During processing of item &V1&, BOM components should automatically be
entered in the sales document. However, one of the components could not
be entered.
Explosion of the bill of material was stopped at this component.
Check how the item has been exploded.
You should delete the item from the sales order. Once the problem has
been solved, you can still add the item to the order.
Error message extract from SAP system. Copyright SAP SE.
V1110
- BOM explosion of item & had to be terminated ?The SAP error message V1110, which states "BOM explosion of item & had to be terminated," typically occurs during the process of bill of materials (BOM) explosion in the context of production planning or material requirements planning (MRP). This error indicates that the system encountered an issue while trying to explode the BOM for a specific item, leading to the termination of the process.
Causes:
- Circular References: The BOM may contain circular references, where an item refers back to itself either directly or indirectly.
- Missing Components: One or more components in the BOM may be missing or not properly defined in the system.
- Incorrect BOM Structure: The BOM structure may be incorrectly configured, leading to inconsistencies.
- Data Inconsistencies: There may be inconsistencies in the master data, such as incorrect unit of measure or invalid material status.
- Excessive Depth: The BOM may be too deep or complex, exceeding system limits for processing.
- Configuration Issues: There may be issues with the configuration of the MRP or production planning settings.
Solutions:
- Check BOM Structure: Review the BOM for the item in question to ensure that it is correctly structured and does not contain circular references.
- Validate Components: Ensure that all components listed in the BOM are valid and exist in the system. Check for any missing materials or incorrect material types.
- Review Master Data: Check the master data for the materials involved, including unit of measure, material status, and other relevant settings.
- Simplify BOM: If the BOM is too complex, consider simplifying it or breaking it down into smaller, manageable components.
- Check Configuration: Review the configuration settings for MRP and production planning to ensure they are set up correctly.
- Use Transaction Codes: Utilize transaction codes like CS03 (Display BOM) to analyze the BOM and identify any issues.
- Debugging: If the issue persists, consider debugging the process to identify the exact point of failure.
Related Information:
By following these steps, you should be able to identify the cause of the V1110 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
V1109
Profit center &1 is not defined on &2 for plant &3
What causes this issue? The system checked the profit center entered and determined that it either does not exist, that is not valid on the sales ord...
V1108
Reorder point for item &1 has been exceeded: &2 &3
What causes this issue? You have entered an unusually large quantity in item &V1&. Materials management agreed on a reorder point for this ma...
V1111
The plant is missing for BOM explosion of item &
What causes this issue? You have entered a material for which the system is to explode the bill of material and copy the components as sub items into...
V1112
You do not have the authorization to explode the bill of material
What causes this issue? You do not have the necessary authorization for exploding a bill of material.System Response The system does not allow you a...
Click on this link to search all SAP messages.