Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: UPP_PP_K - Messages for Planning Processor Core
Message number: 057
Message text: Hierarchy &1 contains invalid nodes
In addition to the hierarchy-bearing characteristic, hierarchy &V1&
also contains nodes on the characteristic with the technical name &V2&.
This characteristic is also contained in the current planning layout
and is in the header area or in the data columns. However, if the
hierarchy is displayed in the entry screen, then characteristic &V2& is
also contained in the lead column.
Hierarchy &V1& cannot be used in the current planning layout.
If you want to display a BW hierarchy in the lead column of a planning
layout, then either use hierarchies with postable nodes or hierarchies
that only contain text nodes in addition to the hierarchy-bearing
characteristic. If the hierarchy-bearing characteristic has
higher-level characteristics, then these characteristics should be
contained in the header area of the planning layout.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
UPP_PP_K057
- Hierarchy &1 contains invalid nodes ?The SAP error message UPP_PP_K057, which states "Hierarchy &1 contains invalid nodes," typically occurs in the context of SAP's planning and budgeting applications, particularly when dealing with hierarchies in the Universal Planning (UPP) module. This error indicates that there are nodes in the specified hierarchy that are not valid or cannot be processed correctly.
Cause:
- Invalid Nodes: The hierarchy may contain nodes that are not properly defined or are missing necessary attributes.
- Data Integrity Issues: There may be inconsistencies in the data, such as references to nodes that do not exist or have been deleted.
- Incorrect Hierarchy Structure: The hierarchy may not adhere to the required structure or rules defined in the system.
- Authorization Issues: The user may not have the necessary permissions to access certain nodes within the hierarchy.
Solution:
- Check Hierarchy Definition: Review the hierarchy definition in the system to ensure that all nodes are correctly defined and that there are no missing or invalid entries.
- Validate Nodes: Use transaction codes like
RSH1
(for InfoObjects) orRSH2
(for InfoProviders) to check the validity of the nodes in the hierarchy.- Rebuild Hierarchy: If the hierarchy is corrupted, consider rebuilding it from scratch or restoring it from a backup if available.
- Data Consistency Check: Run consistency checks on the data to identify and rectify any discrepancies.
- Authorization Check: Ensure that the user has the necessary authorizations to access all nodes in the hierarchy.
- Consult Documentation: Refer to SAP documentation or support notes related to the specific version of SAP you are using for any known issues or patches.
Related Information:
RSH1
, RSH2
, and others related to planning and budgeting.If the problem persists after trying the above solutions, it may be beneficial to contact SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
UPP_PP_K056
Same selection in data row &1 and comparison row &2
What causes this issue? You attempted to execute planning layout in which data is displayed for the same characteristic value combination both in com...
UPP_PP_K055
Same selection in data column &1 and comparison column &2
What causes this issue? You attempted to execute planning layout in which data is displayed for the same characteristic value combination both in com...
UPP_PP_K058
Hierarchy &1 is not suited to the planning mode -> see long text
What causes this issue? In the planning layout, you must decide whether planning is to be made in a hierarchical data model or whether possibly used ...
UPP_PP_K059
Hierarchy &1 does not contain any postable nodes
What causes this issue? In the planning layout, you must decide whether planning is to be made in a hierarchical data model or whether possibly used ...
Click on this link to search all SAP messages.