Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: UPC - Planning: General Error Messages
Message number: 419
Message text: Selected node &1 does not exist
The node &V1& selected as the start value for characteristic &V2& with
the specified compound table does not exist in hierarchy &V3&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
UPC419
- Selected node &1 does not exist ?The SAP error message UPC419, which states "Selected node &1 does not exist," typically occurs in the context of SAP's planning and forecasting applications, particularly when working with the SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) modules. This error indicates that the system is trying to access a node (such as a product, location, or other master data) that is not defined or does not exist in the system.
Causes:
- Missing Master Data: The node you are trying to access may not have been created or may have been deleted.
- Incorrect Node Reference: The node reference might be incorrectly specified in the planning book, data view, or configuration.
- Data Model Issues: There may be issues with the data model or hierarchy that prevent the node from being recognized.
- Authorization Issues: The user may not have the necessary authorizations to view or access the specified node.
- Transport Issues: If the system has recently undergone a transport, the node may not have been transported correctly.
Solutions:
- Check Master Data: Verify that the node exists in the master data. You can do this by navigating to the relevant master data transaction (e.g., transaction code
MM03
for material master) and checking if the node is present.- Correct Node Reference: Ensure that the node reference in your planning book or data view is correct. Double-check any filters or selections that may be applied.
- Review Data Model: If you are using IBP or APO, review the data model and hierarchy settings to ensure that the node is correctly defined and linked.
- User Authorizations: Check the user roles and authorizations to ensure that the user has access to the node in question.
- Transport Validation: If the issue arose after a transport, validate that all necessary objects were transported correctly and that the target system is in sync with the source system.
Related Information:
If the problem persists after trying the above solutions, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
UPC418
Hierarchies with link nodes cannot be used
What causes this issue? Node &V1& is a link node. Only hierarchies can be used in BPS which do not contain any link nodes.System Response Th...
UPC417
Hierarchy &1 is maintained inconsistently
What causes this issue? The values of the compounded characteristics of the start and end node of the range &V3& (node ID &V2&) are d...
UPC420
Hierarchy &1 cannot be used
What causes this issue? You can only use those BW hierarchies that have a unique root node.System Response The system issues an error message and wi...
UPC500
**** Maintenance characteristic relationships ***************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.