Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: UPC - Planning: General Error Messages
Message number: 305
Message text: Job &1 was scheduled for background processing
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You can check on the execution of the job in the job overview.
You can access the job log, that is, any error messages, using the log
display - not using the spool display.
Error message extract from SAP system. Copyright SAP SE.
UPC305
- Job &1 was scheduled for background processing ?The SAP error message UPC305 indicates that a job (denoted as &1) has been scheduled for background processing. This message typically arises when a user attempts to execute a report or transaction that is designed to run in the background, but the job has not yet completed or is in the process of being scheduled.
Cause:
- Job Scheduling: The job is scheduled to run in the background, and the system is informing you that it is in the queue.
- Long Processing Time: The job may take a long time to process, leading to a delay in completion.
- System Load: High system load or resource contention may delay the execution of background jobs.
- Job Conflicts: There may be conflicts with other jobs that are scheduled to run at the same time.
Solution:
- Check Job Status: Use transaction code SM37 to check the status of the job. You can filter by user, job name, or date to find the specific job.
- Monitor Job Execution: If the job is still running, you may need to wait for it to complete. If it is stuck or has failed, you can analyze the job log for errors.
- Adjust Scheduling: If there are too many jobs scheduled at the same time, consider rescheduling some of them to reduce load.
- Increase Resources: If the system is under heavy load, consider increasing system resources or optimizing the job to run more efficiently.
- Review Job Configuration: Ensure that the job is configured correctly and that there are no issues with the parameters being passed to it.
Related Information:
If the issue persists after checking the job status and making adjustments, it may be beneficial to consult with your SAP Basis team or SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
UPC304
The planning function cannot be executed
What causes this issue? The planning function works on characteristic &V1&. In the planning level or in the planning package there are restri...
UPC303
Object &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
UPC306
Report &1 could not be entered in job &2
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
UPC307
Fields (&1) that are not in the level, must remain initial
What causes this issue? You have changed fields in a planning function, which are not contained in the level. This leads to errors in further process...
Click on this link to search all SAP messages.