Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: UPC - Planning: General Error Messages
Message number: 307
Message text: Fields (&1) that are not in the level, must remain initial
You have changed fields in a planning function, which are not contained
in the level. This leads to errors in further processing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Alter your function module.
Error message extract from SAP system. Copyright SAP SE.
UPC307
- Fields (&1) that are not in the level, must remain initial ?The SAP error message UPC307 indicates that certain fields specified in the message (represented by &1) are not part of the current level in a hierarchical structure, and as a result, they must remain uninitialized (i.e., empty or blank). This error typically occurs in the context of SAP's Universal Planning or similar applications where data is structured in levels, such as in planning scenarios.
Cause:
- Hierarchical Structure: The error arises when you attempt to assign values to fields that are not defined at the current level of the hierarchy. For example, if you are working with a planning hierarchy and trying to input data at a higher level, but the fields you are trying to populate are only valid at a lower level.
- Field Configuration: The fields in question may not be configured to accept values at the specified level, leading to this error.
- Data Entry Error: There may be a mistake in the data entry process, where fields are incorrectly filled or referenced.
Solution:
- Check Hierarchical Levels: Review the hierarchical structure of your planning model. Ensure that you are entering data at the correct level and that the fields you are trying to populate are valid for that level.
- Field Configuration: Verify the configuration of the fields in the planning model. Ensure that the fields are set up correctly to accept values at the desired level.
- Clear Fields: If the fields are not applicable at the current level, clear any values that have been entered in those fields to comply with the requirement that they must remain initial.
- Consult Documentation: Refer to the SAP documentation or help resources for specific guidance on the planning model you are using, as there may be additional constraints or configurations that need to be considered.
- Contact Support: If the issue persists and you cannot identify the cause, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.
Related Information:
SAC
(SAP Analytics Cloud) or BPC
(Business Planning and Consolidation).By following these steps, you should be able to resolve the UPC307 error and ensure that your data entry aligns with the requirements of the SAP system.
Get instant SAP help. Sign up for our Free Essentials Plan.
UPC306
Report &1 could not be entered in job &2
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
UPC305
Job &1 was scheduled for background processing
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
UPC308
Global planning sequence was terminated with errors
What causes this issue? Errors occurred when executing global planning sequence.System Response The system issues an error message and will not allo...
UPC309
Planning sequence &1 has been executed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.