Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix UPC230 - Rescheduling lead to invalid values


SAP Error Message - Details

  • Message type: E = Error

  • Message class: UPC - Planning: General Error Messages

  • Message number: 230

  • Message text: Rescheduling lead to invalid values

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message UPC230 - Rescheduling lead to invalid values ?

    The SAP error message UPC230, which states "Rescheduling lead to invalid values," typically occurs in the context of production planning and scheduling within SAP's Advanced Planning and Optimization (APO) module or similar areas. This error indicates that the rescheduling process has resulted in values that are not valid according to the system's constraints or business rules.

    Causes:

    1. Invalid Time Intervals: The rescheduling may have resulted in time intervals that are not permissible, such as negative lead times or overlapping production orders.
    2. Capacity Constraints: The rescheduling might violate capacity constraints, leading to situations where resources are over-allocated or under-allocated.
    3. Configuration Issues: Incorrect configuration of planning parameters, such as lead times, safety stock levels, or production versions, can lead to invalid values.
    4. Data Integrity Issues: Missing or incorrect master data (like material master, BOM, routing) can cause the rescheduling to generate invalid results.
    5. Dependencies and Sequencing: If there are dependencies between orders or specific sequencing requirements that are not met, it can lead to this error.

    Solutions:

    1. Review Rescheduling Parameters: Check the parameters used for rescheduling to ensure they are set correctly and do not lead to invalid values.
    2. Check Capacity Planning: Ensure that the capacity of resources is correctly defined and that the rescheduling does not exceed these capacities.
    3. Validate Master Data: Review the master data for the materials involved, including BOMs, routings, and production versions, to ensure they are complete and accurate.
    4. Adjust Lead Times: If lead times are causing the issue, consider adjusting them to ensure they are realistic and valid.
    5. Analyze Dependencies: Look into any dependencies or sequencing rules that may be causing conflicts during the rescheduling process.
    6. Use Simulation Tools: If available, use simulation tools within SAP to test different scenarios before executing the rescheduling.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/RESCHED for rescheduling or /SAPAPO/SDP94 for planning board analysis.
    • SAP Notes: Check for any SAP Notes related to UPC230 for specific patches or updates that may address known issues.
    • Documentation: Review SAP documentation on production planning and scheduling for best practices and guidelines.
    • User Forums: Engage with SAP community forums or user groups to see if others have encountered and resolved similar issues.

    If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and data setup in your SAP environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker