Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: U9 - Message Class for Output in Application Log
Message number: 112
Message text: Material &1 plant &2 production version &3: Operation &4 is rework
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
U9112
- Material &1 plant &2 production version &3: Operation &4 is rework ?The SAP error message U9112 indicates that there is an issue related to a production version in the context of a material and plant. Specifically, it states that the operation in question is classified as "rework." Here’s a breakdown of the cause, potential solutions, and related information for this error:
Cause:
- Rework Operation: The operation specified in the error message is marked as a rework operation in the production version. This typically means that the operation is intended for correcting defects or issues in previously produced items.
- Production Version Configuration: The production version may not be correctly configured to handle rework operations, or the system may not be set up to process rework in the current context.
- Routing Issues: There may be issues with the routing associated with the production version, such as missing or incorrect operations.
- Material Status: The material may have a status that prevents it from being processed in the usual manner, especially if it is marked for rework.
Solutions:
- Check Production Version: Review the production version for the material and plant specified in the error message. Ensure that the operations are correctly defined and that the rework operation is intended.
- Routing Verification: Verify the routing associated with the production version. Ensure that all operations, including the rework operation, are correctly defined and that there are no missing steps.
- Material Master Data: Check the material master data for any restrictions or statuses that may affect the production process. Ensure that the material is not blocked or restricted for production.
- Rework Configuration: If rework operations are not intended to be processed in the current scenario, consider adjusting the configuration to either remove the rework designation or to handle it appropriately.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling rework operations and production versions.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Sign up for our Free Essentials Plan.
U9111
Material &1 plant &2 production version &3: Phase has no activities
What causes this issue? Phase &V4& has no activity. There may be different causes for this. The resource does not have a scheduling formula. ...
U9110
Material &1 plant &2: BOM header material not APO-relevant
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
U9113
Material &1 plant &2 production version &3: Sec.res. has no activities
What causes this issue? The secondary resource or suboperation &V4& does not have any activities. There may be different causes for this. The...
U9114
Material &1 plant &2 production version &3: Operation has no activities
What causes this issue? Operation &V4& does not have any activities. There may be different causes for this. The work center does not have a ...
Click on this link to search all SAP messages.