Message type: E = Error
Message class: U9 - Message Class for Output in Application Log
Message number: 111
Message text: Material &1 plant &2 production version &3: Phase has no activities
Phase &V4& has no activity. There may be different causes for this.
The resource does not have a scheduling formula.
The default values in the recipe were not evaulated.
As a result, a duration could not be determined for the phase.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Remedy the causes of errors described above.
Error message extract from SAP system. Copyright SAP SE.
U9111
- Material &1 plant &2 production version &3: Phase has no activities ?The SAP error message U9111 indicates that there is an issue with a production version in the system. Specifically, it means that the specified phase in the production version does not have any activities associated with it. This can occur in various scenarios, particularly in production planning and execution.
Cause:
- Missing Activities: The production version defined for the material and plant does not have any activities assigned to the specified phase.
- Incorrect Configuration: The production version may not be properly configured, leading to missing or incomplete data.
- Data Inconsistency: There may be inconsistencies in the master data, such as the Bill of Materials (BOM) or routing, which can lead to this error.
- Phase Definition: The phase in question may not have been defined correctly in the routing or may not be relevant for the production version being used.
Solution:
- Check Production Version: Verify the production version for the material and plant in question. Ensure that it is correctly defined and active.
- Review Routing: Go to the routing associated with the production version and check if the phase has any activities defined. If not, you may need to add the necessary operations or activities.
- Update Master Data: If there are missing activities, update the routing or BOM as needed to include the required operations for the phase.
- Check Phase Configuration: Ensure that the phase is correctly configured in the system. If it is a new phase, make sure it has been properly set up in the routing.
- Consult Documentation: Refer to SAP documentation or help resources for guidance on how to properly set up production versions and routing.
Related Information:
C202
(Change Routing) or C201
(Display Routing) to check and modify the routing details.C223
to maintain production versions and ensure they are correctly linked to the appropriate routing and BOM.By following these steps, you should be able to identify the root cause of the U9111 error and implement the necessary corrections to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
U9110
Material &1 plant &2: BOM header material not APO-relevant
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
U9109
Material &1 plant &2 production version &3: System error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
U9112
Material &1 plant &2 production version &3: Operation &4 is rework
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
U9113
Material &1 plant &2 production version &3: Sec.res. has no activities
What causes this issue? The secondary resource or suboperation &V4& does not have any activities. There may be different causes for this. The...