How To Fix U9013 - &1( &2): Secondary resource for operation has no activities


U9013 - Overview

  • Message type: E = Error

  • Message class: U9 - Message Class for Output in Application Log

  • Message number: 013

  • Message text: &1( &2): Secondary resource for operation has no activities

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message U9013 - &1( &2): Secondary resource for operation has no activities ?
    The SAP error message U9013 typically indicates that a secondary resource for a specific operation in a production order or a similar process does not have any assigned activities. This can occur in various contexts, such as production planning, project management, or maintenance planning.
    
    Cause: Missing Activities: The secondary resource (e.g., a machine, tool, or labor) has not been assigned any activities for the operation in question. Incorrect Configuration: The resource may not be properly configured in the system, leading to a lack of activities being assigned. Data Entry Errors: There may have been an oversight during the creation or modification of the production order or operation, resulting in missing data. Resource Availability: The secondary resource may not be available for the operation due to scheduling conflicts or maintenance.
    Solution: Check Resource Assignment: Go to the production order or operation in question and verify that the secondary resource is correctly assigned. Ensure that it has the necessary

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker