Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix U9012 - &1( &2): No capacity found


SAP Error Message - Details

  • Message type: E = Error

  • Message class: U9 - Message Class for Output in Application Log

  • Message number: 012

  • Message text: &1( &2): No capacity found

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message U9012 - &1( &2): No capacity found ?

    The SAP error message U9012 typically indicates that there is no available capacity for a specific resource or work center when trying to schedule a production order or a similar operation. This can occur in various scenarios, such as during production planning, capacity planning, or when trying to allocate resources for a task.

    Causes of Error U9012

    1. Capacity Constraints: The work center or resource may have reached its maximum capacity, meaning that no additional work can be scheduled at that time.
    2. Incorrect Planning Parameters: The planning parameters for the work center may not be set correctly, leading to miscalculations of available capacity.
    3. Resource Availability: The resource may be marked as unavailable due to maintenance, holidays, or other scheduling conflicts.
    4. Incorrect Master Data: Issues with the master data for the work center, such as incorrect capacity settings or missing data, can lead to this error.
    5. Scheduling Conflicts: Other orders or operations may be scheduled at the same time, leading to conflicts in resource allocation.

    Solutions to Error U9012

    1. Check Capacity Planning:

      • Review the capacity planning for the affected work center. Ensure that the available capacity is sufficient for the planned operations.
      • Use transaction codes like CM01 (Capacity Overview) or CM21 (Capacity Planning) to analyze the capacity situation.
    2. Adjust Scheduling:

      • If the work center is at full capacity, consider rescheduling other orders or operations to free up capacity.
      • You can also adjust the production order's start or finish dates to avoid conflicts.
    3. Review Master Data:

      • Check the master data for the work center to ensure that the capacity settings are correct. This includes checking the available capacity, shift patterns, and any planned downtimes.
      • Use transaction code CR01 to review and modify work center data.
    4. Resource Availability:

      • Verify if the resource is marked as available. If it is not, update the resource's availability status.
      • Check for any planned maintenance or holidays that may affect resource availability.
    5. Consult with Production Planning:

      • If the issue persists, consult with your production planning team to understand if there are any broader issues affecting capacity planning.
    6. Use Capacity Evaluation Reports:

      • Utilize SAP reports to evaluate capacity utilization and identify bottlenecks. Reports like S_ALR_87013558 (Capacity Evaluation) can provide insights.

    Related Information

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CM01, CM21, CR01, and COHV (for production order handling).
    • SAP Notes: Check SAP Notes for any known issues or patches related to capacity planning and scheduling.
    • Documentation: Review SAP documentation on capacity planning and work center management for best practices and troubleshooting tips.

    By following these steps, you should be able to identify the cause of the U9012 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker