Do you have any question about this error?
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 216
Message text: Meter read. unit &1 in install. &2 (time slice from &3) has portion &4
If you enter an alternative portion in the contract, the system does
not check if this portion has the same length as the
<DS:TRAN.E41A>original portion:</>&V4&. The original portion &V4& is
specified in meter reading unit &V1& in installation &V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Compare the period length of the alternative portion with that of the
original portion &V4&.
If you still wish to use the alternative portion even though the two
portions have different lengths, you must change the allocation of the
meter reading unit in installation &V2&. The period lengths of the
meter reading unit and the alternative portion must be the same.
Error message extract from SAP system. Copyright SAP SE.
TU216
- Meter read. unit &1 in install. &2 (time slice from &3) has portion &4 ?Get instant SAP help. Start your 7-day free trial now.
TU215
Transfer parameters &1 for function module &2 not sufficient
What causes this issue? Function module &V2& was given an incomplete parameter: &V1&.System Response The system issues an error mess...
TU214
Advance payment not permissible on &1
What causes this issue? Reasons: A renewed agreement for advance payment on the specified date would result in a combination of budget billing - adva...
TU217
Deferral date is set to due date
What causes this issue? You specified deferral date &V1&. This is earlier than the due date &V2&.System Response Since the deferral ...
TU218
Enter a date that falls before stop date &2 of bud. billing plan
What causes this issue? The date you entered, &V1&, lies after the stop date (&v2&). This is not allowed.System Response The system ...
Click on this link to search all SAP messages.