Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 108
Message text: Maintain combination of control parameters &1 and &2 fully
Only one of the control parameters &V1& and &V2& has been maintained
correctly.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You must maintain both the parameters <ZH>&V1& </> and <ZH>&V2&</>.
Error message extract from SAP system. Copyright SAP SE.
TU108
- Maintain combination of control parameters &1 and &2 fully ?The SAP error message TU108, which states "Maintain combination of control parameters &1 and &2 fully," typically occurs in the context of transportation management or logistics execution within SAP. This error indicates that there is an incomplete configuration for the specified control parameters in the system.
Cause: The error is usually caused by one of the following reasons: Incomplete Configuration: The combination of the specified control parameters (e.g., shipping point, transportation zone, etc.) has not been fully defined in the system. Missing Entries: There may be missing entries in the relevant customizing tables that are required for the system to process the transportation or logistics data correctly. Incorrect Settings: The settings for the control parameters may not align with the expected values or may be incorrectly set.
Solution: To resolve the TU108 error, you can follow these steps: Check Configuration: Go to the relevant customizing transaction (e.g., SPRO) and navigate to the area related to transportation management or logistics
Get instant SAP help. Sign up for our Free Essentials Plan.
TU107
&1 schedule records were created without budget billing amount due dates
What causes this issue? The fields 'allowable date (C/N)' and 'budget billing cycle' were maintained in the portion and the corre...
TU106
BB collection not permissible since BB cycle = '00' in portion &1
What causes this issue? You have entered <LS>00</> in the <LS>budget billing cycle</> field for the portion found in the sche...
TU109
Cannot create BB plan because no BB dates exist on &1 for &2 &3
What causes this issue? You have attempted to read budget billing amount due dates which do not exist. When you created the schedule records, you ent...
TU110
Portion &1 not used in any meter reading unit
What causes this issue? You have attempted to find the schedule records of the meter reading unit that correspond to the schedule records of the port...
Click on this link to search all SAP messages.