Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 046
Message text: Creation date &1 of bud. bill. plan falls after scheduled reading date &2
You tried to create a budget billing plan for date &V1&, on which meter
reading &V2& (meter reading unit &v3&) has already taken place.
The budget billing plan cannot be created.
Invoice the current period to create a new budget billing plan.
Error message extract from SAP system. Copyright SAP SE.
TU046
- Creation date &1 of bud. bill. plan falls after scheduled reading date &2 ?The SAP error message TU046 indicates that there is a mismatch between the creation date of a budget billing plan and the scheduled reading date. Specifically, the error states that the creation date of the budget billing plan (denoted as &1) is later than the scheduled reading date (denoted as &2). This situation typically arises in the context of billing and invoicing processes within SAP, particularly in the Utilities module.
Cause:
- Incorrect Date Entry: The creation date of the budget billing plan was entered incorrectly, possibly due to user error or system misconfiguration.
- System Configuration: The system may not be configured correctly to handle the dates associated with budget billing plans and scheduled readings.
- Data Migration Issues: If data was migrated from another system, there may be inconsistencies in the date formats or values.
- Business Process Changes: Changes in business processes or policies may have led to the creation of budget billing plans that do not align with the scheduled reading dates.
Solution:
- Check Dates: Verify the creation date of the budget billing plan and the scheduled reading date. Ensure that the creation date is not later than the scheduled reading date.
- Adjust Dates: If the creation date is incorrect, update it to a date that is on or before the scheduled reading date.
- Review Configuration: Check the configuration settings in the SAP system related to budget billing plans and scheduled readings to ensure they are set up correctly.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on managing budget billing plans and scheduled readings.
- User Training: Ensure that users involved in creating budget billing plans are trained on the importance of date accuracy and the implications of incorrect entries.
Related Information:
FZB1
(Budget Billing Plan) and EL31
(Display Budget Billing Plan) to manage and review budget billing plans.By addressing the root cause of the error and ensuring proper date management, you can resolve the TU046 error and prevent it from occurring in the future.
Get instant SAP help. Sign up for our Free Essentials Plan.
TU045
Enter a permissible to-date
What causes this issue? You cannot create schedule records for more than 25 years after the system date.System Response The system issues an error m...
TU044
No EABP entries exist for budget billing plan &1
What causes this issue? No IS-U-specific EABP entries exist for budget billing plan no. &V1& of the FI-CA structure.System Response Processi...
TU047
Please check the date &1 you have entered
What causes this issue? The selection was unsucessful using the date you have entered.System Response The system issues an error message and will no...
TU048
Enter a permissible factory calendar
What causes this issue? The factory calendar you have used is not permitted.System Response The system issues an error message and will not allow yo...
Click on this link to search all SAP messages.