Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 048
Message text: Enter a permissible factory calendar
The factory calendar you have used is not permitted.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Enter permissible factory calendars in the portion or in the meter
reading unit.
Error message extract from SAP system. Copyright SAP SE.
TU048
- Enter a permissible factory calendar ?The SAP error message TU048, which states "Enter a permissible factory calendar," typically occurs when a user attempts to perform an operation that requires a valid factory calendar, but the system cannot find one that is applicable for the specified date or context.
Cause:
- Invalid Date: The date you are trying to use does not fall within the range of the factory calendar defined in the system.
- Missing Factory Calendar: The factory calendar may not be assigned to the relevant plant or company code.
- Incorrect Configuration: The factory calendar may not be properly configured or activated in the system.
- User Input Error: The user may have entered an incorrect or non-existent factory calendar.
Solution:
Check Factory Calendar Assignment:
- Go to the configuration settings in SAP (Transaction code: SPRO).
- Navigate to Logistics > Production > Production Planning > Basic Data > Define Factory Calendar.
- Ensure that the factory calendar is correctly assigned to the relevant plant or company code.
Verify Date Validity:
- Check the date you are trying to use and ensure it falls within the valid range of the factory calendar.
- You can do this by reviewing the factory calendar settings in the configuration.
Create or Modify Factory Calendar:
- If the factory calendar does not exist or is not set up correctly, you may need to create a new factory calendar or modify the existing one.
- Ensure that the working days, holidays, and any other relevant settings are correctly defined.
Use Correct Factory Calendar:
- If you have multiple factory calendars, ensure that you are selecting the correct one for the operation you are performing.
Consult Documentation:
- Review SAP documentation or help resources for additional guidance on factory calendars and their configuration.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and scheduling.
Get instant SAP help. Sign up for our Free Essentials Plan.
TU047
Please check the date &1 you have entered
What causes this issue? The selection was unsucessful using the date you have entered.System Response The system issues an error message and will no...
TU046
Creation date &1 of bud. bill. plan falls after scheduled reading date &2
What causes this issue? You tried to create a budget billing plan for date &V1&, on which meter reading &V2& (meter reading unit &...
TU049
There is no schedule record for portion &1 after &2
What causes this issue? You have attempted to use a schedule record for portion &V1& that does not exist.System Response The system issues a...
TU050
Date &1 should not be later than &2 (plese check entry)
What causes this issue? The date you have specified is not permitted.System Response The system issues an error message and will not allow you to co...
Click on this link to search all SAP messages.