How To Fix TU020 - Periodic meter reading period(s) for MR unit &1 have different MR dates


SAP Error Message - Details

  • Message type: E = Error

  • Message class: TU - Billing/Scheduling/Budget Billing

  • Message number: 020

  • Message text: Periodic meter reading period(s) for MR unit &1 have different MR dates

  • Show details Hide details
  • What causes this issue?

    The end of the meter reading period of the main meter reading unit is
    different from the end of the meter reading period of the allocated
    meter reading unit(s). This can lead to an inconsistent dataset if an
    allocated meter reading unit has a quarterly budget billing cycle and
    the main meter reading unit is read annually.
    The allocated meter reading unit must be read on the same date as the
    main meter reading unit. You must ensure that both dates are the same.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Adjust the end of the allocated meter reading period so that it matches
    the end of the main meter reading period.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message TU020 - Periodic meter reading period(s) for MR unit &1 have different MR dates ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant