Message type: E = Error
Message class: STPC - Messages for Valuation of Confirmations
Message number: 103
Message text: Resource &1 not assigned at time point &2
No link was established between the iPPE resource and
<DS:GLOS.3526B5C8AFAB52B9E10000009B38F974>Overhead Cost Controlling</>.
The system cannot determine any costs for the activity in Short-Term
Production Costs.
In iPPE, go to the <ZK>factory layout</> and enter the <ZK>worker</> or
<ZK>operating facilities</> and choose <ZK>Load.</> Choose the
<ZK>Costs</> tab and enter a reference to the CO-relevant master data
<DS:GLOS.3526B5D5AFAB52B9E10000009B38F974>cost center</>/
<DS:GLOS.35289F0F9C4A1941E000080009927D9B>activity type</> or
<DS:GLOS.3526B66EAFAB52B9E10000009B38F974>business process</> by
selecting the corresponding data. The assignment of this CO master data
to the iPPE resource gives the iPPE resource a price (activity price)
which is then used both in costing and for confirmation.
Error message extract from SAP system. Copyright SAP SE.
STPC103
- Resource &1 not assigned at time point &2 ?Get instant SAP help. Start your 7-day free trial now.
STPC102
Period for posting date &1 in CO area &2 could not be determined
What causes this issue? The system cannot determine a period in controlling area &2 for posting date &1.System Response Without the period, ...
STPC101
Product cost collector &1 / &2 / &3 does not exist
What causes this issue? The <DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</> used for confirmation (material &1, p...
STPC104
No valuation segment exists for material &1
What causes this issue? Material &1 cannot be valuated because it has no valuation segment. The valuation segment for material &V1&, plan...
STPC105
No valuation segment exists for material &1
What causes this issue? The material master has no accounting or costing view. It is therefore not possible to valuate material &V1& in plant...
Click on this link to search all SAP messages.