How To Fix STPC103 - Resource &1 not assigned at time point &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: STPC - Messages for Valuation of Confirmations

  • Message number: 103

  • Message text: Resource &1 not assigned at time point &2

  • Show details Hide details
  • What causes this issue?

    No link was established between the iPPE resource and
    <DS:GLOS.3526B5C8AFAB52B9E10000009B38F974>Overhead Cost Controlling</>.

    System Response

    The system cannot determine any costs for the activity in Short-Term
    Production Costs.

    How to fix this error?

    In iPPE, go to the <ZK>factory layout</> and enter the <ZK>worker</> or
    <ZK>operating facilities</> and choose <ZK>Load.</> Choose the
    <ZK>Costs</> tab and enter a reference to the CO-relevant master data
    <DS:GLOS.3526B5D5AFAB52B9E10000009B38F974>cost center</>/
    <DS:GLOS.35289F0F9C4A1941E000080009927D9B>activity type</> or
    <DS:GLOS.3526B66EAFAB52B9E10000009B38F974>business process</> by
    selecting the corresponding data. The assignment of this CO master data
    to the iPPE resource gives the iPPE resource a price (activity price)
    which is then used both in costing and for confirmation.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message STPC103 - Resource &1 not assigned at time point &2 ?
    The SAP error message STPC103 "Resource &1 not assigned at time point &2" typically occurs in the context of project management or resource planning within SAP. This error indicates that a specific resource (e.g., a person, machine, or tool) is not assigned to a task or activity at the specified time point.
    
    Cause: Resource Assignment: The resource (denoted as &1) has not been assigned to the project or task at the specified time (denoted as &2). Time Frame Issues: The time point may fall outside the period during which the resource is available or assigned. Project Settings: The project or task settings may not allow for the assignment of the resource at that specific time. Data Entry Errors: There may be a mistake in the data entry, such as incorrect dates or resource IDs.
    Solution: Check Resource Assignment: Go to the project or task in question and verify if the resource is indeed assigned to it. If not, assign

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker