Message type: E = Error
Message class: STPC - Messages for Valuation of Confirmations
Message number: 103
Message text: Resource &1 not assigned at time point &2
No link was established between the iPPE resource and
<DS:GLOS.3526B5C8AFAB52B9E10000009B38F974>Overhead Cost Controlling</>.
The system cannot determine any costs for the activity in Short-Term
Production Costs.
In iPPE, go to the <ZK>factory layout</> and enter the <ZK>worker</> or
<ZK>operating facilities</> and choose <ZK>Load.</> Choose the
<ZK>Costs</> tab and enter a reference to the CO-relevant master data
<DS:GLOS.3526B5D5AFAB52B9E10000009B38F974>cost center</>/
<DS:GLOS.35289F0F9C4A1941E000080009927D9B>activity type</> or
<DS:GLOS.3526B66EAFAB52B9E10000009B38F974>business process</> by
selecting the corresponding data. The assignment of this CO master data
to the iPPE resource gives the iPPE resource a price (activity price)
which is then used both in costing and for confirmation.
Error message extract from SAP system. Copyright SAP SE.
STPC103
- Resource &1 not assigned at time point &2 ?The SAP error message STPC103 "Resource &1 not assigned at time point &2" typically occurs in the context of project management or resource planning within SAP. This error indicates that a specific resource (e.g., a person, machine, or tool) is not assigned to a task or activity at the specified time point.
Cause: Resource Assignment: The resource (denoted as &1) has not been assigned to the project or task at the specified time (denoted as &2). Time Frame Issues: The time point may fall outside the period during which the resource is available or assigned. Project Settings: The project or task settings may not allow for the assignment of the resource at that specific time. Data Entry Errors: There may be a mistake in the data entry, such as incorrect dates or resource IDs.
Solution: Check Resource Assignment: Go to the project or task in question and verify if the resource is indeed assigned to it. If not, assign
Get instant SAP help. Sign up for our Free Essentials Plan.
STPC102
Period for posting date &1 in CO area &2 could not be determined
What causes this issue? The system cannot determine a period in controlling area &2 for posting date &1.System Response Without the period, ...
STPC101
Product cost collector &1 / &2 / &3 does not exist
What causes this issue? The <DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</> used for confirmation (material &1, p...
STPC104
No valuation segment exists for material &1
What causes this issue? Material &1 cannot be valuated because it has no valuation segment. The valuation segment for material &V1&, plan...
STPC105
No valuation segment exists for material &1
What causes this issue? The material master has no accounting or costing view. It is therefore not possible to valuate material &V1& in plant...