Message type: E = Error
Message class: STPC - Messages for Valuation of Confirmations
Message number: 103
Message text: Resource &1 not assigned at time point &2
No link was established between the iPPE resource and
<DS:GLOS.3526B5C8AFAB52B9E10000009B38F974>Overhead Cost Controlling</>.
The system cannot determine any costs for the activity in Short-Term
Production Costs.
In iPPE, go to the <ZK>factory layout</> and enter the <ZK>worker</> or
<ZK>operating facilities</> and choose <ZK>Load.</> Choose the
<ZK>Costs</> tab and enter a reference to the CO-relevant master data
<DS:GLOS.3526B5D5AFAB52B9E10000009B38F974>cost center</>/
<DS:GLOS.35289F0F9C4A1941E000080009927D9B>activity type</> or
<DS:GLOS.3526B66EAFAB52B9E10000009B38F974>business process</> by
selecting the corresponding data. The assignment of this CO master data
to the iPPE resource gives the iPPE resource a price (activity price)
which is then used both in costing and for confirmation.
Error message extract from SAP system. Copyright SAP SE.
STPC103
- Resource &1 not assigned at time point &2 ?The SAP error message STPC103 "Resource &1 not assigned at time point &2" typically occurs in the context of project management or resource planning within SAP. This error indicates that a specific resource (e.g., a person, machine, or tool) is not assigned to a task or activity at the specified time point.
Cause:
- Resource Assignment: The resource (denoted as &1) has not been assigned to the project or task at the specified time (denoted as &2).
- Time Frame Issues: The time point may fall outside the period during which the resource is available or assigned.
- Project Settings: The project or task settings may not allow for the assignment of the resource at that specific time.
- Data Entry Errors: There may be a mistake in the data entry, such as incorrect dates or resource IDs.
Solution:
Check Resource Assignment:
- Go to the project or task in question and verify if the resource is indeed assigned to it.
- If not, assign the resource to the task for the specified time period.
Review Time Period:
- Ensure that the time point specified in the error message is within the availability period of the resource.
- If the resource is not available during that time, consider adjusting the schedule or assigning a different resource.
Adjust Project Settings:
- Review the project settings to ensure that they allow for resource assignments at the specified time.
- Make any necessary adjustments to the project configuration.
Data Validation:
- Double-check the data entered for both the resource and the time point to ensure accuracy.
- Correct any discrepancies found during the validation process.
Consult Documentation:
- Refer to SAP documentation or help resources for additional guidance on resource management and assignment processes.
Related Information:
CJ20N
(Project Builder) or CATS
(Cross-Application Time Sheet) to manage project resources and assignments.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
STPC102
Period for posting date &1 in CO area &2 could not be determined
What causes this issue? The system cannot determine a period in controlling area &2 for posting date &1.System Response Without the period, ...
STPC101
Product cost collector &1 / &2 / &3 does not exist
What causes this issue? The <DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</> used for confirmation (material &1, p...
STPC104
No valuation segment exists for material &1
What causes this issue? Material &1 cannot be valuated because it has no valuation segment. The valuation segment for material &V1&, plan...
STPC105
No valuation segment exists for material &1
What causes this issue? The material master has no accounting or costing view. It is therefore not possible to valuate material &V1& in plant...
Click on this link to search all SAP messages.