How To Fix STPC103 - Resource &1 not assigned at time point &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: STPC - Messages for Valuation of Confirmations

  • Message number: 103

  • Message text: Resource &1 not assigned at time point &2

  • Show details Hide details
  • What causes this issue?

    No link was established between the iPPE resource and
    <DS:GLOS.3526B5C8AFAB52B9E10000009B38F974>Overhead Cost Controlling</>.

    System Response

    The system cannot determine any costs for the activity in Short-Term
    Production Costs.

    How to fix this error?

    In iPPE, go to the <ZK>factory layout</> and enter the <ZK>worker</> or
    <ZK>operating facilities</> and choose <ZK>Load.</> Choose the
    <ZK>Costs</> tab and enter a reference to the CO-relevant master data
    <DS:GLOS.3526B5D5AFAB52B9E10000009B38F974>cost center</>/
    <DS:GLOS.35289F0F9C4A1941E000080009927D9B>activity type</> or
    <DS:GLOS.3526B66EAFAB52B9E10000009B38F974>business process</> by
    selecting the corresponding data. The assignment of this CO master data
    to the iPPE resource gives the iPPE resource a price (activity price)
    which is then used both in costing and for confirmation.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message STPC103 - Resource &1 not assigned at time point &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant