Message type: E = Error
Message class: /SPE/MAN -
Message number: 022
Message text: Postreading of BOM is not permitted; PMR exists for order &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SPE/MAN022
- Postreading of BOM is not permitted; PMR exists for order &1 ?The SAP error message /SPE/MAN022 Postreading of BOM is not permitted; PMR exists for order &1 typically occurs in the context of production order processing, particularly when dealing with Bill of Materials (BOM) and Production Order Management. Here’s a breakdown of the cause, potential solutions, and related information:
Cause: PMR (Production Material Requirement): The error indicates that there is a Production Material Requirement (PMR) associated with the production order specified by &1. This means that the system has already processed the BOM for this order, and any further changes or post-readings are not allowed. BOM Changes: If there have been changes to the BOM after the order was created, the system may prevent further processing to maintain data integrity. Order Status: The status of the production order may also play a role. If the order is in a status that does not allow for BOM changes or post-readings, this error can occur. Solutions: Check PMR Status:
Get instant SAP help. Sign up for our Free Essentials Plan.
/SPE/MAN021
PMR exists for component &1, item &2
What causes this issue? A production material request exists for component &V1&.System Response The system does not allow you to delete the ...
/SPE/MAN020
You cannot select the bulk checkbox; PMR exists for component &1
What causes this issue? A production material request exists for component &V1&.System Response The system does not allow you to select the ...
/SPE/MAN023
SAP EWM-relevant data in order &1 has been changed; stage materials
What causes this issue? In order &V1&, data that is relevant for SAP Extended Warehouse Management (SAP EWM) has been changed but material st...
/SPE/MAN024
You cannot select the backflush checkbox; PMR exists for component &1
What causes this issue? If a production material request has been created without the backflush checkbox being selected, it might be too late to sele...
Click on this link to search all SAP messages.