Message type: E = Error
Message class: SI - Implementation Guide - Status control
Message number: 103
Message text: Planned end & is after the higher-level planned end &
You have specified a plan end which is after the higher-level plan end
date &V2&. The plan end must not be after the plan end date &V2&. This
plan end date is specified by the document at the higher hierarchy
level.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Specify a plan end which is before &V2&.
Error message extract from SAP system. Copyright SAP SE.
SI103
- Planned end & is after the higher-level planned end & ?The SAP error message SI103, which states "Planned end & is after the higher-level planned end &," typically occurs in the context of project management or production planning within SAP. This error indicates that the planned end date of a lower-level task or activity is set to a date that is later than the planned end date of its higher-level task or project. This inconsistency can lead to scheduling conflicts and logical errors in project timelines.
Cause:
- Incorrect Date Entry: The planned end date for a lower-level task was manually entered incorrectly, leading to it being set later than the higher-level task.
- Changes in Higher-Level Task: The planned end date of the higher-level task may have been changed after the lower-level task was created, resulting in a mismatch.
- Dependencies and Relationships: The relationships between tasks (such as finish-to-start) may not be correctly defined, causing the system to flag this inconsistency.
Solution:
- Review Dates: Check the planned end dates of both the higher-level and lower-level tasks. Ensure that the lower-level task's planned end date is not later than that of the higher-level task.
- Adjust Dates: If the lower-level task's planned end date is incorrect, adjust it to be on or before the higher-level task's planned end date.
- Check Dependencies: Review the task dependencies and relationships to ensure they are correctly defined. Adjust them if necessary to reflect the correct sequence of tasks.
- Re-evaluate Project Plan: If the project plan has changed, consider re-evaluating the entire schedule to ensure all tasks align with the new timelines.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to view and edit project details.By addressing the root cause of the error and ensuring that all planned dates are logically consistent, you can resolve the SI103 error and maintain a coherent project schedule.
Get instant SAP help. Start your 7-day free trial now.
SI102
Upload only works for standard unit days
What causes this issue? A system error occurred during locking.System Response The system issues an error message and will not allow you to continue...
SI101
The specified path name does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SI104
Planned end & is before the higher-level planned start &
What causes this issue? You have specified a plan end which is before the higher-level plan begin &V2&. The plan end must be after the plan b...
SI105
Degree of processing set to 100 as status set to &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.