Message type: E = Error
Message class: SI - Implementation Guide - Status control
Message number: 102
Message text: Upload only works for standard unit days
A system error occurred during locking.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE SY_VE_HOLEN OBJECT DOKU ID TX LANGUAGE D
Error message extract from SAP system. Copyright SAP SE.
SI102
- Upload only works for standard unit days ?The SAP error message SI102 ("Upload only works for standard unit days") typically occurs when you are trying to upload data into a system that expects a specific unit of measure, particularly when dealing with time-related data, such as days. This error indicates that the system is configured to accept only standard units (like days) for the upload process, and the data you are trying to upload does not conform to this requirement.
Cause: Incorrect Unit of Measure: The data being uploaded may be in a different unit of measure (e.g., hours, weeks, etc.) instead of the expected standard unit (days).
Configuration Issues: The system may not be properly configured to accept the units you are trying to upload. Data Format Issues: The format of the data being uploaded may not match the expected format for the upload process.
Solution: Check Data Units: Ensure that the data you are trying to upload is in the correct
Get instant SAP help. Sign up for our Free Essentials Plan.
SI101
The specified path name does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SI100
Enter a file name
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SI103
Planned end & is after the higher-level planned end &
What causes this issue? You have specified a plan end which is after the higher-level plan end date &V2&. The plan end must not be after the ...
SI104
Planned end & is before the higher-level planned start &
What causes this issue? You have specified a plan end which is before the higher-level plan begin &V2&. The plan end must be after the plan b...
Click on this link to search all SAP messages.