How To Fix SE195 - Start date of period later than end date (Please correct)


SE195 - Overview

  • Message type: E = Error

  • Message class: SE - Dienstleistungen Stammdaten Leistungsposition

  • Message number: 195

  • Message text: Start date of period later than end date (Please correct)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SE195 - Start date of period later than end date (Please correct) ?
    The SAP error message SE195, which states "Start date of period later than end date (Please correct)," typically occurs when there is a mismatch in the date range specified for a particular operation, such as a report, transaction, or data entry. This error indicates that the start date you have entered is later than the end date, which is logically incorrect.
    
    Cause: Incorrect Date Entry: The most common cause is simply entering the dates in the wrong order. For example, entering a start date of March 31, 2023, and an end date of March 1, 2023. System Configuration: In some cases, the system configuration or settings may lead to this error if the date formats are not correctly recognized. Data Validation Rules: Certain transactions or reports may have specific validation rules that enforce the correct sequence of dates.
    Solution: Check Date Entries: Review the dates you have entered. Ensure that the start date is earlier than

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author