How To Fix /SCMUI/RRP_EPP014 - Minimum lot size greater than maximum lot size


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMUI/RRP_EPP -

  • Message number: 014

  • Message text: Minimum lot size greater than maximum lot size

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMUI/RRP_EPP014 - Minimum lot size greater than maximum lot size ?

    The SAP error message /SCMUI/RRP_EPP014 Minimum lot size greater than maximum lot size typically occurs in the context of production planning and control within the SAP Advanced Planning and Optimization (APO) module. This error indicates that the defined minimum lot size for a product is greater than the maximum lot size, which is logically inconsistent and prevents the system from processing the planning run correctly.

    Cause:

    1. Configuration Error: The minimum lot size and maximum lot size settings in the material master or in the planning parameters are incorrectly configured.
    2. Data Entry Mistake: During the setup of the material or in the planning parameters, the values for minimum and maximum lot sizes may have been entered incorrectly.
    3. Master Data Issues: The issue may arise from inconsistencies in the master data for the product, such as in the material master record or in the production version.

    Solution:

    1. Check Material Master Data:

      • Go to the material master record (transaction code MM03) and check the lot size settings under the relevant views (e.g., MRP view).
      • Ensure that the minimum lot size is less than or equal to the maximum lot size.
    2. Adjust Lot Size Settings:

      • If the minimum lot size is indeed greater than the maximum lot size, adjust the values accordingly. You can do this in the material master (transaction code MM02) or in the relevant planning parameters.
    3. Review Planning Parameters:

      • Check the planning parameters in the APO system to ensure that they are set correctly. This includes reviewing the settings in the SNP (Supply Network Planning) or PP/DS (Production Planning and Detailed Scheduling) areas.
    4. Validate Production Versions:

      • If applicable, check the production versions for the material to ensure that they are correctly defined and that the lot sizes are consistent.
    5. Consult Documentation:

      • Review SAP documentation or help resources for specific guidance on lot size settings and their implications in the planning process.
    6. Testing:

      • After making the necessary adjustments, run the planning process again to ensure that the error is resolved.

    Related Information:

    • Lot Size Types: Understand the different types of lot sizes in SAP, such as fixed lot size, lot-for-lot, and others, to ensure proper configuration.
    • Transaction Codes: Familiarize yourself with relevant transaction codes like MM01 (Create Material), MM02 (Change Material), and MM03 (Display Material) for managing material master data.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues or provide additional guidance related to this error message.

    By following these steps, you should be able to resolve the error and ensure that your planning processes run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant