How To Fix /SCMTMS/PLN_VSR_OL031 - Resource &1 is overloaded (total &2 exceeds available &3 &4)


/SCMTMS/PLN_VSR_OL031 - Overview

  • Message type: E = Error

  • Message class: /SCMTMS/PLN_VSR_OL -

  • Message number: 031

  • Message text: Resource &1 is overloaded (total &2 exceeds available &3 &4)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SCMTMS/PLN_VSR_OL031 - Details

  • The SAP error message /SCMTMS/PLN_VSR_OL031 indicates that a resource in the Transportation Management System (TMS) is overloaded. This means that the total demand on the resource exceeds its available capacity. Here’s a breakdown of the components of the error message:
    
    Resource &1: This refers to the specific resource that is overloaded (e.g., a vehicle, a driver, or a warehouse).
    Total &2: This indicates the total demand or load that is currently assigned to the resource.
    Available &3: This shows the available capacity of the resource.
    &4: This could refer to the unit of measure (e.g., hours, tons, etc.) for the capacity.
    
    Causes
    
    Capacity Misconfiguration: The resource may have been incorrectly configured with a lower capacity than it can actually handle.
    Increased Demand: There may be an unexpected increase in demand for the resource, leading to overload.
    Scheduling Conflicts: Multiple tasks or shipments may be scheduled for the same resource at the same time, causing an overload.
    Data Entry Errors:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SCMTMS/PLN_VSR_OL031 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker