How To Fix /SCMTMS/PLN_VSR_OL022 - Strategy &1 can only be used for schedule selection


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMTMS/PLN_VSR_OL -

  • Message number: 022

  • Message text: Strategy &1 can only be used for schedule selection

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMTMS/PLN_VSR_OL022 - Strategy &1 can only be used for schedule selection ?
    The SAP error message /SCMTMS/PLN_VSR_OL022 indicates that a specific strategy (denoted by &1 in the message) is being used in a context where it is not applicable. This error typically arises in the context of SAP Transportation Management (TM) when trying to execute a planning operation that is not compatible with the selected strategy.
    
    Cause: The error occurs because the strategy you are trying to use is designated specifically for schedule selection, and it cannot be applied in the current context (e.g., during route planning, shipment planning, etc.). This can happen if: The strategy is incorrectly assigned to a planning run or process. The planning parameters or settings are not aligned with the capabilities of the selected strategy. There is a misunderstanding of the intended use of the strategy within the planning process.
    Solution: To resolve this error, you can take the following steps: Check Strategy Assignment: Verify that the strategy you are using is appropriate for the operation

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author