Message type: E = Error
Message class: /SCMB/SCHED_LOG -
Message number: 103
Message text: The date determined by means of delegation is too early
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SCMB/SCHED_LOG103
- The date determined by means of delegation is too early ?The SAP error message
/SCMB/SCHED_LOG103
indicates that the date determined through delegation is too early for the scheduling process. This error typically arises in the context of supply chain management, particularly when dealing with scheduling and planning activities in SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP).Cause:
Delegation Date Issue: The error usually occurs when the system tries to schedule a task or activity based on a delegated date that is earlier than the allowed or expected date. This can happen if:
- The source date for the delegation is set incorrectly.
- The planning parameters or settings do not allow for scheduling at that early date.
- There are constraints or rules in the system that prevent scheduling before a certain date.
Configuration Settings: There may be configuration settings in the system that define the earliest possible scheduling date, which is being violated.
Master Data Issues: Incorrect or incomplete master data (like lead times, production calendars, etc.) can also lead to this error.
Solution:
Check Delegation Settings: Review the delegation settings to ensure that the dates being used for scheduling are correct and within acceptable limits.
Adjust Planning Parameters: If applicable, adjust the planning parameters or settings to allow for earlier scheduling if that is appropriate for your business process.
Review Master Data: Ensure that all relevant master data (like production lead times, transportation lead times, etc.) is correctly maintained and reflects the actual business processes.
Check for Constraints: Look for any constraints or rules in the system that might be preventing scheduling at the desired date. This could include production calendars, availability checks, or other scheduling rules.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error message and its implications in your version of SAP.
Testing: After making adjustments, perform tests to ensure that the scheduling now works as expected without triggering the error.
Related Information:
/SCMB/SCM
for supply chain management.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP SCM or APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SCMB/SCHED_LOG102
The date determined by means of delegation is too late
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCMB/SCHED_LOG101
An activity date is inconsistent with the date specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCMB/SCHED_LOG104
Fixed date earlier than the initial date of activity scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SCMB/SCHED_LOG105
Fixed date later than the initial date of activity scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...