How To Fix /SCMB/SCHED_LOG102 - The date determined by means of delegation is too late


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMB/SCHED_LOG -

  • Message number: 102

  • Message text: The date determined by means of delegation is too late

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/SCHED_LOG102 - The date determined by means of delegation is too late ?

    The SAP error message /SCMB/SCHED_LOG102 indicates that the date determined through delegation is too late for the scheduling process. This error typically arises in the context of supply chain management, particularly when dealing with scheduling and planning activities in SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP).

    Cause:

    1. Delegation Date Issue: The date that has been determined through the delegation process is beyond the acceptable range for scheduling. This could be due to:

      • Incorrect configuration of the scheduling parameters.
      • The source of the delegation (e.g., a supplier or production facility) may not be able to fulfill the request by the determined date.
      • The planning horizon may not be set correctly, leading to dates being calculated that are outside the permissible limits.
    2. Master Data Issues: There may be issues with the master data, such as:

      • Incorrect lead times defined for materials or resources.
      • Inaccurate availability dates for materials or production resources.
    3. Capacity Constraints: If there are capacity constraints in production or logistics, it may lead to delays that push the determined date beyond acceptable limits.

    Solution:

    1. Check Delegation Settings: Review the delegation settings in the system to ensure that they are configured correctly. Make sure that the delegation process is set up to consider the correct lead times and availability.

    2. Adjust Planning Horizon: If the planning horizon is too short, consider extending it to allow for more flexibility in scheduling.

    3. Review Master Data: Check the master data for the materials and resources involved:

      • Ensure that lead times are accurately defined.
      • Verify that the availability dates for materials are correct.
    4. Capacity Planning: Analyze the capacity of production resources and logistics. If there are constraints, consider adjusting the production schedule or sourcing from alternative suppliers.

    5. Error Logs and Messages: Review any additional error logs or messages that may provide more context about the issue. This can help identify specific areas that need attention.

    6. Consult Documentation: Refer to SAP documentation or support notes related to the error message for additional insights and troubleshooting steps.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SCMB/SCM_LOG to view logs related to scheduling and planning.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide patches related to this error.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author