How To Fix SAWE_TIME_PS_GEN012 - In hourly planning unit, &1 days leads to overbooking for the period


SAWE_TIME_PS_GEN012 - Overview

  • Message type: E = Error

  • Message class: SAWE_TIME_PS_GEN - General Message Class Time Planning Sheet

  • Message number: 012

  • Message text: In hourly planning unit, &1 days leads to overbooking for the period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SAWE_TIME_PS_GEN012 - In hourly planning unit, &1 days leads to overbooking for the period ?
    The SAP error message SAWE_TIME_PS_GEN012 typically occurs in the context of project planning and scheduling, particularly when using the Project System (PS) module. This error indicates that there is an overbooking situation in the hourly planning unit, meaning that the planned work exceeds the available capacity for the specified period.
    
    Cause: Capacity Overload: The planned work for a resource (e.g., labor, equipment) exceeds the available capacity for the specified time frame. This can happen if too many tasks are scheduled for the same resource or if the resource's availability is not correctly defined. Incorrect Planning Units: The planning units may not be set correctly, leading to discrepancies in how time is calculated and displayed. Resource Allocation Issues: Resources may be allocated to multiple tasks simultaneously, leading to conflicts in scheduling. Incorrect Time Period Definition: The time period defined for the planning may not align with the actual availability of resources.
    Solution: Review Resource Availability: Check the availability

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant