How To Fix SAWE_BO_SA_TIME_PS026 - Planning month field cannot be initial


SAWE_BO_SA_TIME_PS026 - Overview

  • Message type: E = Error

  • Message class: SAWE_BO_SA_TIME_PS - Message Class : Staff Assignment Time Planning Sheet

  • Message number: 026

  • Message text: Planning month field cannot be initial

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


SAWE_BO_SA_TIME_PS026 - Details

  • The SAP error message SAWE_BO_SA_TIME_PS026 indicates that the "Planning month field cannot be initial." This error typically occurs in the context of planning scenarios within SAP, particularly when working with planning functions or planning layouts in SAP BW (Business Warehouse) or SAP S/4HANA.
    
    Cause: The error arises when a required field, specifically the planning month, is left empty or not populated. This field is essential for the planning process as it defines the time period for which the planning data is being entered or processed. If the planning month is not specified, the system cannot proceed with the planning operation.
    Solution: To resolve this error, you should ensure that the planning month field is populated with a valid value before executing the planning function or process. Here are the steps you can take: Check Input Fields: Ensure that the planning month field is filled in the planning layout or input form. If you are using

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


SAWE_BO_SA_TIME_PS026 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker