How To Fix /SAPPCE/PNV902 - Contract start date (&2) for WBS element is after the end of period (&1)


/SAPPCE/PNV902 - Overview

  • Message type: E = Error

  • Message class: /SAPPCE/PNV -

  • Message number: 902

  • Message text: Contract start date (&2) for WBS element is after the end of period (&1)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPPCE/PNV902 - Details

  • The SAP error message /SAPPCE/PNV902 indicates that there is a mismatch between the contract start date for a Work Breakdown Structure (WBS) element and the defined end of the period in the system. Specifically, the contract start date is set to a date that is after the end of the specified period, which is not allowed.
    
    Cause: Date Configuration: The contract start date for the WBS element is set incorrectly, meaning it is later than the end date of the reporting or accounting period. Period Control Settings: The period control settings in the system may not be configured correctly, leading to discrepancies in date validation. Data Entry Error: There may have been a manual data entry error when setting the contract start date.
    Solution: Check Contract Dates: Review the contract start date for the WBS element and ensure it is set to a date that is on or before the end of the period defined in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPPCE/PNV902 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant