Do you have any question about this error?
Message type: E = Error
Message class: /SAPPCE/PNV -
Message number: 902
Message text: Contract start date (&2) for WBS element is after the end of period (&1)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/PNV902
- Contract start date (&2) for WBS element is after the end of period (&1) ?The SAP error message
/SAPPCE/PNV902
indicates that there is a mismatch between the contract start date for a Work Breakdown Structure (WBS) element and the defined end of the period in the system. Specifically, the contract start date is set to a date that is after the end of the specified period, which is not allowed.Cause:
- Date Configuration: The contract start date for the WBS element is set incorrectly, meaning it is later than the end date of the reporting or accounting period.
- Period Control Settings: The period control settings in the system may not be configured correctly, leading to discrepancies in date validation.
- Data Entry Error: There may have been a manual data entry error when setting the contract start date.
Solution:
- Check Contract Dates: Review the contract start date for the WBS element and ensure it is set to a date that is on or before the end of the period defined in the system.
- Adjust Period Settings: If necessary, adjust the period settings in the system to ensure that they align with the contract dates. This may involve extending the end date of the period if it is appropriate to do so.
- Correct Data Entry: If the date was entered incorrectly, correct the date in the relevant transaction or master data record.
- Consult Documentation: Review any relevant documentation or guidelines for setting up contracts and WBS elements to ensure compliance with system requirements.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to access and modify the WBS element and its associated contract.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems (PS) or contract management.
Get instant SAP help. Start your 7-day free trial now.
/SAPPCE/PNV901
The forecasted end date (&2) for WBS El is before the start of period &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/PNV850
********** Messages 800 - 850 reserved for BAPI constr. progress reports
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPCE/PNV903
Not all cost elements &1 were maintained for &2, &3 and &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPPO/ACR029
Component &1 process &2 does not exist in Customizing/Systemcustomizing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.