How To Fix /SAPPCE/PNV010 - Cost element &1 is not permitted for construction progress reports


/SAPPCE/PNV010 - Overview

  • Message type: E = Error

  • Message class: /SAPPCE/PNV -

  • Message number: 010

  • Message text: Cost element &1 is not permitted for construction progress reports

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPPCE/PNV010 - Details

  • The SAP error message /SAPPCE/PNV010 Cost element &1 is not permitted for construction progress reports typically occurs in the context of project management and construction progress reporting within the SAP system, particularly when using the Project System (PS) module or related functionalities.
    
    Cause: This error indicates that the cost element specified (represented by &1) is not allowed for use in construction progress reports. This restriction can arise due to several reasons: Configuration Settings: The cost element may not be configured to be used in construction progress reporting. This could be due to settings in the controlling area or project definition. Cost Element Type: The type of cost element (e.g., internal, external, overhead) may not be compatible with the requirements for construction progress reporting. Project Structure: The project structure or WBS (Work Breakdown Structure) element may not be set up correctly to allow the use of that cost element. Authorization Issues: There may be authorization restrictions preventing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPPCE/PNV010 - Related SAP Errors